Author: skinner-customs

  • How Long Before You Can Drive on New Concrete in Eastern Idaho

    How Long Before You Can Drive on New Concrete in Eastern Idaho

    I run Skinner Customs out of Rigby, and the question I get before the truck has even pulled off the job is how long before you can drive on new concrete. Everybody wants the one number, and I understand why. Your car is parked on the street and the neighbor keeps asking about it.

    Here is the honest answer. Foot traffic in a day or two. Your car in about a week. Anything heavy, and that includes a loaded trailer, a camper, a delivery truck or a dumpster, at 28 days. And in October or April around here, stretch all three of those.

    Below is why those numbers are what they are, and what actually changes them on a job in Jefferson or Bonneville County.

    Why 28 days is the number that matters

    Concrete does not dry. It cures. Cement and water react chemically and keep reacting for weeks, and the slab is gaining strength the whole time. That reaction is why a slab can look finished on day two and still be nowhere near able to carry a truck.

    The code puts a clock on it. The 2018 IRC as adopted in Idaho sets minimum strength in Table R402.2, and the footnote on that table is the part people never see:

    “Strength at 28 days psi.”

    Every strength number in the code is measured at 28 days. So when I tell you the mix is 4,000 PSI, I am telling you what it will be at 28 days, not what it is on Thursday afternoon. Concrete typically has a majority of that strength inside the first week and keeps climbing after, which is exactly why a passenger car at seven days is fine and a concrete truck at seven days is not.

    That same code section is also where our climate shows up. Table R402.2 requires 3,500 PSI for garage floor slabs, porches and steps exposed to the weather in a severe weathering area, and it requires the concrete be air entrained:

    “Concrete shall be air-entrained. Total air content (percent by volume of concrete) shall be not less than 5 percent or more than 7 percent.”

    Air entrainment is microscopic bubbles in the mix that give freezing water somewhere to expand. It is not optional here, and it is one of the quiet differences between a slab that still looks good in fifteen years and one that starts flaking in five.

    The timeline I give people

    Day one. Stay off it. The finish is still soft enough to mark, and a footprint or a dog print is permanent. This is also when I do not want anybody setting a hose on it or washing a car next to it.

    Day two to three. Walk on it. Normal foot traffic, no dragging furniture, no bikes with kickstands, no pressure washing.

    Day seven or so. Park a car or a pickup on it. Pull straight in and straight out, do not crank the wheel while sitting still, and keep off the outside edges. Edges and corners are the weakest part of any slab because there is nothing beside them holding the load.

    Day 28. Everything else. Trailers, campers, the fifth wheel, a delivery truck, a dumpster for a project. If somebody wants to drop a loaded dumpster on a new driveway, I ask them to put plywood under the wheels even after 28 days, because a dumpster concentrates all its weight on four small points.

    Those are the warm weather numbers. A pour at 40 degrees is a different job.

    What cold weather does to the wait

    The chemical reaction that cures concrete slows down as it gets colder, and in Eastern Idaho that matters from roughly mid October through April. Cold concrete gains strength slower, so every number above gets longer. I plan protection into those pours with blankets, and sometimes with hot water or an accelerator in the mix, and I still tell the homeowner to wait longer than they would in July.

    If a slab freezes before it has gained enough strength, the damage is permanent and it shows up as surface failure later. That is not something a sealer fixes.

    This is also why I would rather pour your driveway in September than talk you into a November pour because the schedule had a hole in it.

    Things that shorten a slab’s life in its first winter

    A few habits do more damage in the first six months than the next ten years.

    De-icing salt. Do not put it on a slab in its first winter. Any of it. A new surface has not finished hardening and salt accelerates the freeze thaw cycle that causes scaling. Sand gives you traction without the chemistry. After the first winter, I would still rather you use sand.

    Standing water at the edges. Water that pools against a new slab, especially where a downspout dumps, works into the edge and freezes there. Get the downspout extended past the concrete.

    Early sealing. A sealer on green concrete can trap moisture that still needs to leave. I give a new slab time before sealing it, and in our freeze thaw climate sealing is worth doing on the right schedule, not the fastest one.

    Turning the wheel while parked. Power steering on a stationary car twists a lot of force into one spot. On a young slab that is how you get a scuff you cannot sand out.

    What is actually under there matters more than the wait

    I will say this because it is the part nobody asks about. How long you stay off a new slab matters far less than what is underneath it.

    Four inches of clean compacted gravel base, built in lifts on questionable soil. Rebar, number three or number four on an eighteen inch grid, not wire mesh, because mesh gets stepped on during the pour and ends up at the bottom of the slab doing nothing. A 4,000 PSI minimum mix for our freeze thaw cycles. Control joints cut at the right spacing and depth so the slab cracks where we told it to.

    Do those four things and your driveway will outlast the house’s first roof. Skip them and no amount of patience in week one saves it.

    Frequently asked questions

    Can I walk on new concrete the next day?
    Usually yes, carefully, on normal flatwork in warm weather. The surface is hard enough that you will not leave a print, but it is nowhere near full strength. No pressure washing, no dragging anything across it.

    Can I park on new concrete after a week?
    A car or a half ton pickup, generally yes in summer. Pull straight in, stay off the edges, and do not turn the wheel while stopped. Wait the full 28 days for anything heavier, and longer if the pour was cold.

    Does concrete cure faster in hot weather?
    It gains early strength faster, but hot and windy is harder to finish and more likely to crack from rapid moisture loss. Hot weather pours need their own protection, usually curing compound and timing the pour early in the day. Faster is not the same as better.

    How long until I can seal a new driveway?
    Later than most people want. A new slab needs time before a sealer goes on, and putting one on too early can trap moisture in the concrete. The one thing I will say flatly is to keep de-icing salt off it through the first winter either way.

    Why does my neighbor’s contractor say three days and you say 28?
    We are probably answering different questions. Three days is roughly when you can walk on it. Twenty eight days is when the code says the mix has reached its specified strength. If somebody is telling you to park a loaded trailer on a four day old slab, that is not a shortcut, that is somebody else’s problem later.

    Before you pour, ask what is going under it

    If you are getting bids on a driveway, patio or shop slab in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, ask every bidder three things: how thick, what is the base and how is it compacted, and rebar or mesh. The answers tell you more about how long that slab lasts than anything about the finish.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Vapor Barrier Under a Concrete Slab: What Idaho Code Requires and What I Pour Anyway

    Vapor Barrier Under a Concrete Slab: What Idaho Code Requires and What I Pour Anyway

    The sheet of plastic that goes under a concrete slab is the cheapest material on the whole job and the one I get the most argument about. It is six-mil poly. It costs almost nothing. And whether it belongs under your pour is not a matter of opinion, because the code answers it for most of the slabs we put down.

    I run Skinner Customs out of Rigby and pour slabs across Jefferson, Bonneville and Madison counties. Here is where the poly goes, where it does not, and what it actually does once the concrete is on top of it.

    What a vapor barrier does, and what it does not

    Concrete is not waterproof. A cured slab is full of microscopic capillaries, and ground moisture wicks up through them for as long as the slab exists. That is not a defect. It is how concrete behaves.

    A vapor barrier is a sheet of plastic between the ground and the bottom of the slab that stops that moisture from getting into the concrete in the first place.

    What it does not do is stop liquid water. If you have a drainage problem, water standing against a foundation, a downspout dumping next to the slab, a high water table in spring, poly is not the fix. Grade, drains and gutters are the fix. The barrier handles vapor. Everything else is a dirt-work problem.

    What the Idaho-adopted code actually requires

    Idaho builds on the International Residential Code. The section that governs this is R506.2.3 Vapor Retarder, and it reads:

    A 6-mil (0.006 inch; 152 um) polyethylene or approved vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist.

    Three specifics in that one sentence that get missed on job sites: six mil is the minimum thickness, the laps are at least six inches, and the sheet goes directly under the slab, on top of the gravel, not buried somewhere in the base.

    The same section lists the exceptions, where a vapor retarder is not required:

    • Garages, utility buildings and other unheated accessory structures
    • Unheated storage rooms under 70 square feet, and carports
    • Driveways, walks, patios and other flatwork not likely to be enclosed and heated at a later date
    • Where the building official approves it based on local site conditions

    Read that third exception again, because it is the one people quote at me. Flatwork is exempt only when it is not likely to be enclosed and heated later. A detached shop slab that is going to get a heater and a finished floor eventually is not really in that bucket, and your inspector knows it.

    Where I run poly and where I do not

    Pour Vapor barrier? Why
    Basement slab Yes Heated living space, direct ground contact
    Main-floor slab on grade Yes Code, and the flooring above it depends on it
    Slab with radiant tubing Yes, always A heated slab drives moisture harder, and the barrier goes under the insulation package
    Attached garage Code does not require it, I still run it Cheap now, impossible later, and garages get finished
    Shop or pole barn slab Depends on the plan Heated or likely to be heated, run it; cold storage, not required
    Driveway, sidewalk, patio No Exempt, and it can hurt the finish
    ADA ramp or exterior steps No Exterior flatwork, same exemption

    That last pair is worth saying plainly, because somebody always asks. Do not put plastic under a driveway. Exterior flatwork needs to be able to give up water out of both faces while it cures. Trap it underneath and all the bleed water has to come out the top, which is how you get a soft, dusty, scaling surface on a slab that should have lasted thirty years.

    Why ground moisture is a real issue in Eastern Idaho

    We are not a humid climate, and people assume that means this is a non-issue here. The opposite is closer to the truth.

    Irrigation runs all summer across most of the valley, and the water table under a lot of ground around Rigby and Shelley moves with it. I have dug footings in July with dry dust on the surface and damp soil at thirty inches. That damp soil is what a slab is in contact with for its entire life.

    Then the heating season arrives. Inside is warm and dry, under the slab is cool and damp, and vapor moves from damp to dry every hour of every winter day. If there is no barrier, the slab becomes the path.

    What that looks like, usually a year or two after somebody moves in: glue-down flooring that releases at the edges, a laminate floor that cups, white mineral bloom on an exposed slab, a basement that smells like a basement no matter how much it gets aired out, and an epoxy or coating job that blisters and peels off in sheets.

    Every one of those is a finish failure caused by a missing sheet of plastic that costs less than the fuel to get the truck to the job.

    How it gets installed, and how it gets wrecked

    Code gets you the material and the lap. The rest is workmanship.

    • It goes on top of the compacted base. My standard is four inches of clean gravel minimum, placed in lifts and compacted each lift, more on fill or soft ground. The poly sits on the finished base, directly under the concrete.
    • Laps get six inches minimum, and I tape them. Code does not require tape. Taped seams stay put when a crew is walking the grid.
    • It turns up at the edges and gets held against the forms or the foundation wall, so there is no gap at the perimeter where the whole thing leaks.
    • Penetrations get sealed. Every plumbing stub and sleeve through the sheet is a hole. Boot it or tape it.
    • Rebar supports, not boots on plastic. Rebar only on my jobs, number three or number four on an eighteen-inch grid, held from the center to the upper third of the slab the way the code requires. Chairs and dobies sit on the poly without opening it. What puts holes in a vapor barrier is a crew dragging mesh across it, which is one more reason I do not use mesh.
    • Walk it before the truck shows up. A torn sheet is a two-minute fix before the pour and a permanent one after.

    A barrier with a dozen punctures and no edge detail is not a barrier. It is a receipt.

    The sand layer question

    Older practice was to put a couple of inches of sand over the poly, a blotter layer, so the slab did not dry only from the top. You still hear it recommended.

    I do not do it on heated slabs, and I would push back if somebody asked me to. That sand layer holds water, and the water it holds is on the wrong side of the barrier, right under the concrete where it has nowhere to go but up into the slab. If the finish is the concern, the honest fix is a lower water content in the mix and a finishing crew that does not chase bleed water, not a sponge under the floor.

    Four thousand PSI minimum for this climate, same as every other pour I do, and a broom finish on anything that lives outside.

    What skipping it costs

    The barrier is not where the money is. Base prep, rebar, concrete and labor are where the money is. Poly is a rounding error on the material list.

    The reason to care is that it is the single least reversible thing on the job. You can seal a slab later. You can grind it, coat it, cut joints in it, even replace flooring on it twice. You cannot get under it. Fixing a missing vapor barrier means removing the slab, and nobody does that, so what actually happens is the homeowner lives with a floor that fails on a cycle and gets replaced every few years.

    If you are getting bids and one of them is noticeably light, ask where the poly is, what thickness, and whether the seams get taped. The answer tells you a lot about the rest of the number.

    Frequently asked questions

    Is a vapor barrier required under a concrete slab in Idaho?
    Under a heated slab, yes. The Idaho-adopted IRC section R506.2.3 requires a six-mil polyethylene or approved vapor retarder with laps of at least six inches between the slab and the base course. Garages, unheated accessory buildings, small unheated storage rooms, carports and exterior flatwork are listed exceptions.

    How thick does the plastic need to be?
    Six mil is the code minimum. Heavier sheeting, ten or fifteen mil, resists puncture better and is worth it on a slab that matters, but six mil installed carefully beats fifteen mil full of holes.

    Does a garage slab need a vapor barrier?
    Code exempts garages. I run it anyway. Garages get insulated, heated and coated years later, and at that point the one thing you cannot add is the layer under the concrete.

    Should there be poly under my driveway?
    No. Driveways, walks and patios are exempt, and a barrier under exterior flatwork traps bleed water under the slab and hurts the finished surface.

    Can a vapor barrier be added to an existing slab?
    Not underneath it. What you can do on top is a penetrating sealer or a moisture-tolerant coating system, and any flooring over a slab with no barrier should be chosen with that in mind. Test the slab for moisture before anything gets glued down.

    Does a radiant slab need one?
    Yes, and it is the pour where I am least willing to skip it. A heated slab moves moisture harder than an unheated one, and the barrier belongs under the insulation, not between the insulation and the concrete.

    Pouring a slab this year?

    If you have a slab coming up, a basement, a shop floor, a garage or a house on grade, send me the plan and the site. I will tell you what the base needs, where the barrier goes, and what the inspector in your county is going to look for.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Metallic Epoxy Floors in Idaho Falls: Cost, Colors and Where They Work

    Metallic Epoxy Floors in Idaho Falls: Cost, Colors and Where They Work

    A metallic epoxy floor from Skinner Customs starts at $8 per square foot. It is a high-gloss, one-piece floor with a marble, stone or flowing liquid-metal look, and every one is poured and worked by hand, so no two come out the same. It works in basements, bathrooms, entries, kitchens, shops and garages. In a garage that gets parked on, the topcoat is what makes it last.

    Skinner Customs installs metallic floors across Idaho Falls, Rexburg, Rigby, Ammon, Pocatello, Blackfoot, Driggs, Victor and Jackson, all year round, with the building heated through the cure in winter. Below is what it costs, where it works, and the trade-offs nobody mentions until after the install.

    What a metallic epoxy floor actually is

    A metallic floor is a clear epoxy loaded with fine metallic pigment. Once it is poured, the installer works it with rollers, brushes and tools to push the pigment around and create movement, veining and depth. As the epoxy levels and cures, the pigment settles into those patterns and catches the light. That is where the marble, stone and liquid-metal looks come from.

    Because the pattern is made by hand in the wet coating, every floor is one of a kind. You pick the colors and the general look, and the floor itself comes out a little different every time.

    What a metallic floor costs

    Metallic floors at Skinner Customs start at $8 per square foot on a sound slab. Here is what that looks like by space:

    Space Typical size Starting price
    Entry or mudroom About 100 sq ft From about $800
    1-car garage About 250 sq ft From about $2,000
    Living room or open area About 400 sq ft From about $3,200
    2-car garage About 450 sq ft From about $3,600
    Basement About 800 sq ft From about $6,400

    Small rooms like bathrooms usually run above the per-foot rate, because setup and prep take about the same time whether the room is 50 square feet or 500. Crack repair, old flooring or adhesive removal, moisture problems and stairs add to the number. For comparison with flake and solid floors, see our Garage Floor Coating Cost in Idaho Falls guide.

    Where metallic epoxy works best

    Basements. The most common place for it. A metallic floor turns a plain concrete basement into a finished space without carpet, tile grout or flooring that cares about a little moisture. Test the slab for moisture first.

    Bathrooms and laundry rooms. One continuous surface means no grout lines to scrub and nowhere for water to sit. Accent colors, like a blue “river” running through a white floor, work well in small rooms.

    Entries, kitchens and living areas. A white or grey marble look in an entry makes the first impression of the whole house.

    Garages and shops. Yes, including garages that get parked on. The key is the topcoat. A tough, UV-stable topcoat over the metallic layer takes the tires, salt and scuffs so the pattern underneath stays clean.

    The honest trade-offs

    • Gloss shows dust and scratches. A high-gloss floor shows footprints and dust more than a flake floor does. A satin topcoat helps.
    • It can be slick when wet. In garages, entries and bathrooms, ask for an anti-slip additive in the topcoat.
    • Repairs do not blend invisibly. Because every pattern is unique, a damaged spot is hard to patch without it showing. That is another reason the topcoat matters.
    • Sun can yellow epoxy. Spaces with a lot of direct sun need a UV-stable topcoat or the floor can amber over time.
    • The slab has to be sound. Cracks get repaired and the slab gets ground flat first. A metallic floor will not hide a slab that is still moving.

    Picking colors

    The looks that come up most around here:

    • Grey and silver. The safest pick for garages, shops and basements. Hides dust better than the extremes.
    • White marble. Bright and high-end for entries, kitchens and bathrooms.
    • Black and silver. Dramatic, with deep veining. Shows dust more than grey.
    • Copper and bronze. Warm tones that pair well with wood trim and cabin-style homes.
    • Accent rivers. A contrasting color, like blue or teal, poured through a lighter base.

    How a metallic floor goes in

    1. Prep. Grind the slab, repair cracks and clean it. In winter, heat the building ahead of time so the slab is warm.
    2. Base coat. A primer or base coat seals the concrete and gives the metallic layer a uniform start.
    3. Metallic coat. The pigmented epoxy is poured and worked by hand to build the pattern.
    4. Topcoat. A clear protective topcoat goes on once the metallic layer cures, with anti-slip added where needed.
    5. Cure. Plan on 2 to 3 days before you park on it or move heavy furniture back in. You can walk on it sooner.

    Installing in the cold months? Here is how we handle a winter epoxy install in Eastern Idaho.

    Metallic vs. flake

    Flake is the practical workhorse. It hides dirt, gives great grip and costs less. Metallic is the showpiece. It looks like stone, it has no grout lines, it shines, and it costs more. Plenty of people put flake in the garage and metallic in the basement. We compared flake, solid epoxy and polyaspartic in Flake vs. Solid Epoxy vs. Polyaspartic.

    Frequently asked questions

    How much does a metallic epoxy floor cost in Idaho Falls?
    At Skinner Customs, metallic floors start at $8 per square foot on a sound slab. A two-car garage starts around $3,600 and an 800 square foot basement around $6,400. Slab repairs are extra.

    Can you put a metallic epoxy floor in a garage?
    Yes. We install metallic floors in garages that get parked on. A tough, UV-stable topcoat over the metallic layer is what makes it hold up to tires and salt.

    Is a metallic floor slippery?
    High gloss can be slick when wet. An anti-slip additive in the topcoat fixes most of that, and we recommend it in garages, entries and bathrooms.

    Can you install metallic epoxy in winter?
    Yes. We install all winter and heat the building before, during and after the install so the slab stays warm through the cure.

    How long before I can use the floor?
    Plan on 2 to 3 days before you park on it or move heavy furniture back in. Light foot traffic comes sooner.

    Want to see what it would look like in your space?

    Send a few photos of the room or garage, the rough size, and any colors or floors you like the look of. We will tell you what fits and what it costs.

    Need a metallic epoxy floor in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Can You Install an Epoxy Garage Floor in Winter? What Works in Eastern Idaho

    Can You Install an Epoxy Garage Floor in Winter? What Works in Eastern Idaho

    Yes, you can install an epoxy or flake garage floor in winter in Eastern Idaho. What matters is the right product and a warm slab, because cold concrete, not cold air, is what ruins a winter install. Standard epoxy needs the slab at roughly 55°F or warmer, and it has to stay warm through the cure. Polyaspartic systems are built to cure on colder concrete. In an attached garage that is heated before, during and after the install, winter works fine for a garage floor.

    Skinner Customs installs garage, shop and basement floor coatings all winter across Idaho Falls, Rexburg, Rigby, Ammon, Pocatello, Blackfoot, Driggs, Victor and Jackson, and we heat the garage before, during and after the install. This is how a cold-weather install works and what to plan for.

    The number that matters is slab temperature

    Air temperature is easy to fix. Turn on a heater and the garage is 60°F in a couple of hours. The concrete lags far behind. A slab on grade in January can sit in the 30s or low 40s even when the air above it feels comfortable, and the coating reacts at the temperature of the concrete it is touching.

    Most coating manufacturers spell out three checks on their data sheets:

    • Slab temperature. Standard 100% solids epoxy generally needs the slab at 55°F or above. Below about 50°F, many epoxies cure slowly, cure soft or stop curing. Cold-cure epoxies and polyaspartics are rated lower, and some polyaspartic and polyurea products go down on slabs in the 30s.
    • Dew point. The slab should stay at least 5°F above the dew point through the cure. If it does not, moisture condenses on the surface and the coating will not bond or will cloud.
    • Staying warm. The slab has to hold that temperature through the first day or more of cure, not just during application.

    That is why a winter install starts with an infrared thermometer pointed at the floor, not at the thermostat. For the same reason on the pouring side, see cold weather concrete curing in Idaho.

    How a winter install actually works

    1. Check the slab ahead of time. Slab temperature, moisture and the forecast for install week.
    2. Heat the garage 24 to 48 hours before. Long enough for the concrete itself to warm up. Uninsulated or detached buildings can take longer.
    3. Close up the drafts. Door seals, gaps and open vents get covered so the heat stays in.
    4. Grind, repair and clean. In winter this includes getting every trace of salt residue out of the slab. Salt left in the pores is a common reason coatings lift.
    5. Apply the system. Base coat, full flake broadcast, scrape, topcoat.
    6. Keep the heat on through the cure. At least a full day after the last coat, longer for epoxy in a cold building.
    7. Wait before parking. On our floors, plan on 2 to 3 days with the heat kept on through the cure.

    One thing to avoid: open-flame and unvented propane or kerosene heaters. They put moisture and combustion gases into the air, which can leave a cloudy, greasy film on curing epoxy called amine blush, and they are not safe to run in a closed garage. Indirect-fired or electric heaters are the right tools.

    Which coatings work in the cold

    System Typical minimum slab temperature Winter notes
    Standard 100% solids epoxy About 55°F Needs a well-heated garage before and after. Longest cure in the cold.
    Cold-cure epoxy About 45°F Formulated to react at lower temperatures, with a shorter working time.
    Polyaspartic Often about 35°F to 40°F Cures fast even when cool. A strong winter choice.
    Polyurea Some products lower still Very fast cure. Product-specific limits.

    These are typical ranges. The product data sheet for the exact coating being used is what governs.

    A full-flake floor with an epoxy base and polyaspartic topcoat is only as cold-tolerant as its epoxy base. If your garage is hard to heat, a full polyaspartic system is usually the better winter pick. We compared the systems side by side in Flake vs. Solid Epoxy vs. Polyaspartic.

    Attached garages vs. detached shops

    Attached garages pick up heat from the house and usually run noticeably warmer than outside, so they are the easiest winter installs. A detached garage, pole barn or shop with no insulation in the slab or walls is a different job. It takes longer to bring the concrete up to temperature and more heat to hold it there, and on the coldest stretches of January it can make sense to wait for a milder week.

    How long before you can park on it?

    On floors we install, plan on 2 to 3 days before you park, with the garage kept heated through the cure. You can walk on it sooner. A very cold detached building can stretch that a little, and we will give you the exact time for your floor before we start.

    Plan the install around the forecast too. Parking on a fresh floor with tires full of snow and de-icer is the last thing you want in the first week.

    Why winter is a good time to do it

    • Outdoor concrete slows down. Driveways and patios do not get poured in January, which is why interior coatings are a natural winter project.
    • The sooner it is down, the less salt the bare slab takes. Every storm that soaks salty meltwater into bare concrete adds to the pitting near the door.
    • It is done before spring. When the garage door is open again in April, the floor is already finished.

    Frequently asked questions

    What is the coldest temperature you can install epoxy?
    For standard epoxy, the slab should be about 55°F or warmer and stay above about 50°F through the cure. Polyaspartic and some polyurea products are rated for colder slabs. Always go by the data sheet for the specific product.

    Can I park in the garage while the floor cures?
    No. The floor needs to be completely clear from prep through cure, and vehicles stay out until the installer says the floor is ready.

    Do I need to empty the whole garage?
    Yes. The whole floor gets ground and coated, so everything sitting on it has to come out, including shelving that sits on the slab.

    Can you coat a garage floor that has salt stains and pitting?
    Yes. Salt residue gets cleaned and ground out, and pits and spalls get filled and ground flat before the coating goes down. Most garage floors in this area have some of that by the time they get coated.

    Will the heat make my garage smell?
    Some coatings have an odor during application and early cure. Polyaspartic and solvent-based products are stronger than water-based ones. Ask your installer which product they are using and how long to keep the door to the house closed.

    Planning a winter garage floor?

    Send a few photos of the floor, the garage size, whether the garage is attached and heated, and when you need to be parking on it again. We will tell you which system fits a winter install in your garage and what it costs. Prices start at $6 per square foot; see the garage floor coating cost guide for full numbers.

    Need a garage floor coating in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Flake vs. Solid Epoxy vs. Polyaspartic: Which Garage Floor Holds Up to an Idaho Winter?

    Flake vs. Solid Epoxy vs. Polyaspartic: Which Garage Floor Holds Up to an Idaho Winter?

    For most garages in Eastern Idaho, the best floor is a full-flake system with a polyaspartic topcoat. The flake hides snowmelt residue and grit, the texture gives you grip on a wet floor, and a polyaspartic topcoat handles road salt, sun and hot tires better than an epoxy topcoat does. Solid-color epoxy still makes sense in a basement or a shop that never sees salt or sun. A full polyaspartic system is the upgrade if you want the fastest cure or need to install in a cold garage.

    Skinner Customs installs all three across Eastern Idaho, from Idaho Falls, Rexburg, Rigby, Ammon, Pocatello and Blackfoot to Driggs, Victor and Jackson. Here is how they compare when winter is the real test.

    What each system actually is

    Solid-color epoxy. A pigmented epoxy base coat rolled onto a ground slab, usually followed by a clear topcoat. Professional systems use 100% solids epoxy, which goes on much thicker than the water-based epoxy in hardware-store kits.

    Full-flake floor. A base coat goes down, then colored vinyl flakes are thrown onto the wet base until no base coat shows. That is called broadcasting to refusal. Once it cures, the loose flake is scraped and swept off and a clear topcoat locks it in. The base can be epoxy or polyaspartic. The topcoat is what you actually walk and drive on.

    Polyaspartic. A fast-curing coating in the polyurea family. It can be used as just the topcoat over an epoxy base, or for every layer. It cures in hours rather than a day or more, it does not yellow in sunlight, and many products are rated to go down on a colder slab than standard epoxy.

    How winter tests a garage floor

    • Salt and de-icer. Snow packed on your truck melts on the floor and leaves a salt film every time it dries.
    • Standing water. Meltwater pools in low spots and along the edges for days.
    • Freeze-thaw at the door. The first few feet inside the door freeze and thaw every time the door opens.
    • Grit. Sand and gravel off the roads grind into the surface under your tires and boots.
    • Temperature swings. The slab expands and contracts as the garage swings between freezing and warm.
    • Summer payback. Then July brings hot tires and afternoon sun through the open door.

    A floor that holds up here has to handle all of that, not just look good on install day.

    Head-to-head comparison

    Solid-color epoxy Full flake (epoxy base, polyaspartic top) Full polyaspartic flake
    Road salt and de-icer Fair. Can dull and etch with long exposure Good Very good
    Sun and yellowing Epoxy yellows in direct sun Good. Topcoat is UV-stable Very good
    Hot tire pickup A risk, especially with thin coats Low Low
    Grip when wet Slick unless grit is added Good. Flake adds texture Good
    Hides dirt, salt film and stains Poor Very good Very good
    Movement with temperature swings Rigid Moderate More flexible
    Cold-weather install Needs a warm slab, about 55°F or more Limited by the epoxy base Many products rated for colder slabs
    Installed cost at Skinner Customs From $6 per sq ft From $6 per sq ft From $8 per sq ft

    Whichever system you pick, plan on 2 to 3 days before you park on a new floor from us. Pricing is covered in more detail in our Garage Floor Coating Cost in Idaho Falls guide.

    The topcoat is the layer that matters most

    Most of what people like or hate about a garage floor comes down to the topcoat. It is the layer that takes the salt, the tires and the sun. An epoxy topcoat is cheaper, but it is softer, it ambers in UV and it is the layer most likely to lift under a hot tire. A polyaspartic or urethane topcoat is harder, stays clear in the sun and shrugs off salt. If you only upgrade one thing on a bid, upgrade the topcoat.

    Which system fits which space

    Daily-driver garage, door faces south or west. Full flake with a polyaspartic topcoat, or full polyaspartic. Sun and salt are both in play, so the topcoat has to handle both.

    Daily-driver garage, door faces north or east. Full flake with a polyaspartic topcoat is still the safe pick. Salt is the bigger enemy here than sun.

    Shop with jacks, jack stands and dropped tools. A thicker 100% solids epoxy base for impact strength, full flake, and a polyaspartic topcoat for chemical and salt resistance.

    Basement or finished room. Solid-color, flake or a decorative metallic epoxy all work, since there is no salt and little sun. Test for moisture first. Below-grade slabs can push vapor up and blister a coating that was not built for it.

    Mudroom or entry off the garage. Flake, for the grip and because it hides the dirt that comes in on boots all winter.

    Picking a flake color for an Idaho garage

    Mid-tone blends of grey, tan and black hide road grime and salt film best. Very dark solid floors show every white salt mark. Very light floors show every tire track. If you want the floor to look clean between washes in February, pick a blend with some light and some dark flake in it.

    Frequently asked questions

    Is a flake epoxy floor slippery when wet?
    Less than a solid floor, because the flake adds texture. If the garage sees a lot of meltwater, ask for an anti-slip additive in the topcoat.

    Does road salt ruin epoxy garage floors?
    Salt sitting on an epoxy topcoat for long periods can dull and etch it. A polyaspartic or urethane topcoat resists salt much better. Either way, rinsing the salt film off a few times a winter keeps the floor looking new.

    Can you put polyaspartic over an existing epoxy floor?
    Often, yes, if the old epoxy is still well bonded. It gets sanded or ground so the new coat can bond. Anything peeling has to come off first.

    What is the difference between polyurea and polyaspartic?
    Polyaspartic is a type of polyurea that reacts more slowly, which gives the crew time to apply it evenly. In garage floor talk the two names get used almost interchangeably.

    How do I clean a flake garage floor in winter?
    Squeegee standing meltwater out the door, then rinse with water and a mild cleaner every few weeks to lift salt film. Skip acidic cleaners and harsh solvents.

    Not sure which system fits your garage?

    Send a few photos of the floor, the garage size and which way the door faces, and tell us how you use the space. We will tell you which system fits and what it costs before anyone grinds anything.

    Need a garage floor coating in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Garage Floor Coating Cost in Idaho Falls (2026): Epoxy, Flake and Polyaspartic

    Garage Floor Coating Cost in Idaho Falls (2026): Epoxy, Flake and Polyaspartic

    A professionally installed garage floor coating from Skinner Customs starts at $6 per square foot for solid-color epoxy or a full-flake floor, and at $8 per square foot for a full polyaspartic system. For a typical two-car garage of around 450 square feet, that puts a solid or flake floor at about $2,700 and up before any slab repairs. The condition of your slab can move the number more than the coating you pick.

    Skinner Customs installs garage, shop and basement floor coatings across Eastern Idaho: Idaho Falls, Rexburg, Rigby, Ammon, Pocatello and Blackfoot, plus Driggs, Victor and Jackson. Below are the numbers, what drives them, and what to look for on a bid.

    The three systems and what they cost

    Almost every residential garage coating in this area falls into one of three systems.

    Solid-color epoxy: from $6 per square foot. A pigmented epoxy base coat, usually with a clear topcoat. It looks clean and costs the least, but it shows every tire mark and drip of snowmelt, it can be slick when wet unless grit is added, and epoxy topcoats tend to yellow where the sun hits through an open door.

    Full-flake floor with an epoxy base and polyaspartic topcoat: from $6 per square foot. This is the most common garage floor around here. The base coat goes down, vinyl flakes are broadcast until the floor is fully covered, the loose flake is scraped off, and a clear polyaspartic topcoat seals it. The flake hides dirt, salt film and hairline cracks, and the texture gives your boots something to grip.

    Full polyaspartic (or polyurea) flake system: from $8 per square foot. Same look as the flake floor, but every layer is fast-curing polyaspartic or polyurea. You pay more, and you get a floor that cures faster, handles UV without yellowing, and can be installed in a colder garage.

    Garage size Solid epoxy or full flake Full polyaspartic
    1-car (about 250 sq ft) From about $1,500 From about $2,000
    2-car (about 450 sq ft) From about $2,700 From about $3,600
    3-car (about 700 sq ft) From about $4,200 From about $5,600

    These are starting prices for a sound slab. Crack and spall repair, old coating removal, oil-soaked spots and moisture problems add to the number, and so do stem walls and extra-heavy shop topcoats. Small single-stall garages can also run above the starting rate, because setup and travel get spread over less floor.

    Prep is where the price moves

    Two garages the same size can get very different quotes, and the difference is almost always the slab, not the coating. A coating is only as good as its bond to the concrete, and the bond comes from prep.

    Diamond grinding. The floor gets ground with a diamond grinder to open the surface so the base coat can bite in. This should be built into any professional quote. If a bid says acid etch instead of grinding, ask why.

    Crack and spall repair. Years of salty snowmelt dripping off trucks pits and flakes the top of a garage slab, especially in the first few feet inside the door. That damage gets filled and ground flat before any coating goes down.

    Old coating removal. Peeling paint or a failed DIY kit has to come off completely. Coating over it just means the new floor fails where the old one did.

    Oil and contamination. Oil-soaked spots under where the truck has parked for ten years need extra cleaning or grinding, or the coating will not stick there.

    Moisture mitigation. Mostly a basement issue. Below-grade slabs can push moisture vapor up through the concrete, and a standard coating will blister. A moisture test tells you whether you need a vapor-blocking primer.

    Why Eastern Idaho garages are hard on coatings

    A garage floor here gets a rougher winter than most. Trucks come in packed with snow, ice and road de-icer. That meltwater pools, dries and leaves a salt film. The first few feet inside the door go through freeze-thaw every time the door opens. Then summer brings hot tires and afternoon sun through a west- or south-facing door.

    That combination is why the topcoat matters so much. A thin epoxy topcoat can dull, yellow and lift under hot tires. A polyaspartic or urethane topcoat holds up to salt, UV and hot tires far better, and it is the main reason the flake systems cost what they do.

    If you want the long version of what winter does to bare concrete, we covered it in what winter actually does to concrete in Eastern Idaho.

    Coating vs. sealing vs. doing nothing

    Sealing is the cheaper option. A penetrating sealer soaks into the concrete and helps keep water and salt out, but it does not change how the floor looks and it does not give you a wear surface. It is the right call for driveways and sidewalks. We broke down sealer pricing in concrete sealing cost in Eastern Idaho and which products work in the best concrete sealer for a cold climate.

    Coating puts a new surface on top of the slab. Salt, oil and snowmelt sit on the coating instead of soaking into the concrete, and the floor cleans up with a squeegee and a hose.

    Doing nothing is fine on a slab that stays dry. On a garage floor that takes salt every winter, bare concrete pits and spalls over time, and repairing a spalled slab costs more than coating a sound one.

    DIY kits vs. a professional install

    Big-box epoxy kits run a few hundred dollars for a two-car garage. They are usually water-based, much thinner than a professional system, and rely on acid etching instead of grinding. They can look good for a season. The common failure is hot-tire pickup, where the coating peels up under your tires in the first summer, plus wear and peeling inside the door where the snowmelt sits.

    If you want a floor that lasts, the difference is grinding, a thick base coat, full flake coverage and a real topcoat. That is the part you are paying a crew for.

    What to check on a garage floor coating bid

    • Prep method. Does it say diamond grinding? Grinding beats acid etching for bond.
    • Base coat. What product, and is it 100% solids or water-based?
    • Flake coverage. Full broadcast (floor fully covered) or a partial sprinkle?
    • Topcoat. Polyaspartic, polyurea or urethane topcoats hold up better to salt and sun than an epoxy topcoat.
    • Crack and spall repair. Included, or billed per foot after they start grinding?
    • Moisture. Will they test the slab, especially in a basement?
    • Stem walls and edges. Is the curb or stem wall around the garage included?
    • Return to service. When can you walk on it, and when can you park on it?

    Frequently asked questions

    How much does it cost to coat a 2-car garage in Idaho Falls?
    For about 450 square feet, a solid-color or full-flake floor from Skinner Customs starts around $2,700, and a full polyaspartic system starts around $3,600. Slab repairs are extra.

    How soon can I park on a new garage floor?
    Plan on 2 to 3 days before you park on a new floor from us. You can walk on it sooner. We will give you the exact time for your floor before we start.

    Is polyaspartic worth the extra money?
    It usually is if your garage door faces the sun, you want to park on the floor sooner, or you are installing in cold weather. In a basement or a shop with no sun and no salt, an epoxy system holds up fine.

    How long does a garage floor coating last?
    A properly prepped, professionally installed system with a polyaspartic or urethane topcoat is commonly rated for 10 to 20 years of residential use. Thin DIY kits often fail within a few years.

    Can you coat a garage floor in winter?
    Yes, as long as the slab is warm enough and stays warm through the cure. We explain how it works in Can You Install an Epoxy Garage Floor in Winter?

    Do I need to seal my garage floor before coating it?
    No. The coating does the job a sealer would. If a penetrating sealer is already on the floor, it has to be ground off first so the base coat can bond.

    Will a coating hide cracks?
    A full-flake floor hides hairline cracks and old stains well. Cracks that are still moving get repaired first, and a crack that keeps moving can still show through over time.

    Getting a real number for your garage

    The fastest way to a real price is a few photos and a measurement. Send the garage size (or length and width), one wide photo of the whole floor, close-ups of any cracks, pitting, oil stains or old coating, and which direction the door faces. Let us know when you need to be parking on it again. From there we can tell you which system fits and what it will cost.

    Need a garage floor coating in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Rebar vs Wire Mesh in a Concrete Slab: Why I Only Pour Rebar in Eastern Idaho

    Rebar vs Wire Mesh in a Concrete Slab: Why I Only Pour Rebar in Eastern Idaho

    Rebar vs wire mesh is the line item most homeowners skip right past when they are comparing concrete bids, and it is the one that explains most of the price gap. Two bids on the same driveway, same square footage, same four inches of concrete, and one is noticeably cheaper. Nine times out of ten the cheap one has mesh in it.

    I run Skinner Customs out of Rigby. I pour rebar, number three or number four on an 18-inch grid, on everything. Not because it sounds better in a bid, but because I am the one who gets called back in five years to look at the result, and I have torn out enough mesh slabs around Idaho Falls and Rexburg to know how that movie ends.

    Here is what each one actually does, what happens to mesh during a real pour, and what the code in Idaho has to say about it.

    Neither one stops concrete from cracking

    Start here, because this is where most of the confusion comes from. Steel in a slab is not crack prevention. Concrete shrinks as it cures and keeps moving with temperature and moisture, and it will relieve that tension somewhere. Joints decide where. Steel decides what the crack does after it forms.

    The National Ready Mixed Concrete Association says it directly in CIP 6, Joints in Concrete Slabs on Grade: “Note that wire mesh will not prevent cracking. Mesh tends to keep the cracks and joints from opening up.”

    That is the honest job description for mesh. It is a crack-width manager. Rebar, placed properly and sized for the slab, does more. It keeps the two sides of a crack in the same plane, it carries load across that crack, and it holds panels together when the ground underneath is not perfectly uniform, which in our part of the state it never is.

    So when somebody tells you their mesh slab “won’t crack,” that is not a specification, that is a sales line.

    What happens to mesh during an actual pour

    This is the part that does not show up in a bid comparison.

    Mesh comes in rolls or flat sheets and it has to sit at a specific height inside the slab to do anything at all. On a 4-inch slab that means roughly the middle to upper third of the thickness. The problem is that mesh is light, it springs, and a concrete pour is a job site with people and wheelbarrows and boots on it.

    Crews walk the mesh flat. The concrete truck chute hits it. Somebody drags a rake across it. By the time the slab is screeded, a lot of that mesh is lying on the gravel at the bottom of the pour, which is the one place it does nothing, because the tension that opens a shrinkage crack is in the top of the slab.

    The Idaho-adopted 2018 International Residential Code addresses exactly this. Section R506.2.4, Reinforcement Support, reads: “Where provided in slabs-on-ground, reinforcement shall be supported to remain in place from the center to upper one-third of the slab for the duration of the concrete placement.”

    Read the last six words again. For the duration of the concrete placement. Not when it was laid out that morning. Not in the photo the contractor took before the truck arrived. During the pour and at the end of it. Mesh that has been stepped flat does not meet that, and pulling it up with a hook as the concrete goes in is a technique people talk about more than they do.

    Rebar on chairs stays where it was set. It is stiff enough to walk on without collapsing, it ties into a grid that holds its shape, and it is still at the right height when the screed goes across.

    How I build a slab here

    Nothing exotic, and I will put it in writing because it is the same on every job:

    • Base. Minimum 4 inches of compacted gravel, placed in multiple lifts where the soil is questionable. Most slab failures I tear out started here, not with the steel.
    • Steel. Rebar, number three or number four, on an 18-inch grid, tied and set on chairs so it stays in the middle to upper third of the slab.
    • Mix. 4,000 PSI minimum. Our freeze-thaw cycles are hard on a weak mix, and the surface is where you see it first.
    • Joints. Tooled or sawed to at least one quarter of the slab thickness, with panels kept square and spaced to slab thickness rather than eyeballed.
    • Finish. Broom finish standard. Color, stamp and exposed finishes are extra.

    My floor on flatwork is eight dollars a square foot and it goes up from there with thickness, access and finish. I publish that number for one reason: when a bid lands under it, the money came out of something on the list above. Thinner slab, mesh instead of rebar, less base prep, weaker mix. It did not come out of the contractor’s profit.

    Where mesh is not automatically wrong

    I am not going to pretend mesh has no legitimate uses. On an interior slab that will be covered, on a small shed pad where nothing is riding on it, or inside a design where an engineer specified a mesh product at a specific height with real support under it, it can be fine. Welded wire in flat sheets, chaired up and not walked on, is a different animal from a roll of mesh rolled out on gravel.

    What makes mesh the wrong call on most of what I pour around here is the combination: exterior slab, freeze and thaw, vehicle loads, variable soils, and a crew that has to walk on it to place and finish the concrete. Under those conditions the steel has to be stiff enough to survive the pour. Rebar is.

    There is one more place rebar earns its money. Heaving. When a slab lifts or settles unevenly in spring, a rebar grid keeps the panels tied together, so what you get is a crack that stays level instead of two slabs with a lip you catch your boot on. The lipped version is the one that becomes a trip hazard and a tear-out.

    What this looks like on a bid

    Ask for it in writing. Three lines, and any real contractor can give you all three without hesitating:

    1. Reinforcement type, size and spacing. You want words like “number four rebar on 18-inch centers,” not “reinforced.”
    2. How the steel is supported. Chairs, dobies, or something that holds height through the pour. This is the R506.2.4 question.
    3. Slab thickness and PSI. Four inches minimum on residential flatwork, more under vehicle traffic, 4,000 PSI minimum for our winters.

    If one bid says rebar on chairs and another says reinforced with mesh, you are not looking at the same slab and the prices should not be compared as if you were.

    Frequently asked questions

    Is rebar always better than wire mesh in a concrete slab?

    For exterior flatwork in a freeze-thaw climate with vehicle loads, yes, in my experience. Rebar holds its position through the pour and keeps a cracked slab level and tied together. Mesh is a crack-width manager at best, and only if it stays at the right height, which on a real job site it usually does not.

    Does rebar stop a driveway from cracking?

    No. Nothing does. Joints control where the cracking happens and rebar controls how it behaves after it happens. Any contractor promising a crack-free slab is selling something.

    What size rebar should be in a residential driveway?

    What I use is number three or number four on an 18-inch grid for standard residential flatwork. Heavier loads, thicker slabs or an engineered design can change that, and if an engineer stamps a drawing, the drawing wins.

    How much more does rebar cost than mesh?

    The steel itself is a modest part of a flatwork bid. The real difference is labor, because rebar gets cut, tied and chaired instead of rolled out. That is also exactly why it works.

    Can rebar be added to a slab that was already poured on mesh?

    No. Reinforcement goes in before the concrete. If a mesh slab is cracking and moving, the options are repair where it is isolated or replacement where the base and the thickness are the real problem.

    Why do some contractors still use mesh?

    It is faster and cheaper to install, and it lets a bid come in low enough to win. The homeowner does not find out what the difference was until the slab is five years old and the contractor is not answering the phone.

    Ask what is going into your slab before it is poured

    Once the truck leaves, nobody can tell you what is inside your concrete without cutting it open. The reinforcement conversation has to happen while you are still comparing bids.

    If you are getting flatwork or foundation bids in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, ask every bidder the three questions above and compare the answers, not just the totals.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Why Concrete Cracks Between the Joints: Spacing, Depth and Timing in Eastern Idaho

    Why Concrete Cracks Between the Joints: Spacing, Depth and Timing in Eastern Idaho

    Concrete control joints are the most misunderstood thing on a flatwork job. People look at the lines in a driveway and think they are decoration, or a seam where two pours met. They are neither. They are pre-planned cracks, cut or tooled where I want the concrete to break so it does not break somewhere I did not choose.

    I run Skinner Customs out of Rigby and I pour flatwork from Rexburg down to Shelley. When somebody calls me in March upset about a crack, the first thing I do is look at where the joints are. Most of the time the crack is not a mystery. The panels were too big, the joints were too shallow, the layout had a corner in it that was never going to survive, or the saw came out too late. That is a workmanship problem, not bad luck.

    Here is how joints are supposed to work, what the industry actually recommends, and what our freeze-thaw winters do to a slab that was jointed wrong.

    Concrete is going to move, so the question is where

    Concrete shrinks as it cures and keeps moving with moisture and temperature for its whole life. It is strong in compression and weak in tension, so when that shrinkage gets restrained by the base, by a footing, by a wall, the tension builds until something gives.

    The National Ready Mixed Concrete Association puts it plainly in CIP 6, Joints in Concrete Slabs on Grade: “Joints are simply pre-planned cracks.” That is the whole idea. Nobody in this trade can promise you a slab with zero cracks. What a contractor can do is decide in advance where the cracking goes, make those locations straight, and make them easy to seal and maintain.

    In Eastern Idaho that matters more than it does in a mild climate. A slab in Jefferson or Bonneville County goes through freeze and thaw cycles every late fall and every spring, sometimes several in one week. Water finds a crack, freezes, expands and widens it. A straight tooled joint sheds that water. A random crack with a lip on it holds it and spalls at the edges.

    Joint spacing: the number that actually matters

    The spacing rule is the one thing I wish every homeowner knew before they collect bids.

    CIP 6 says: “The maximum joint spacing should be 24 to 36 times the thickness of the slab. For example, the joint spacing for a 4-inch thick slab should be about 10 feet.” It then adds a hard ceiling: “It is further recommended that joint spacing be limited to a maximum of 15 feet.”

    Run that against the slabs people actually have:

    Slab thickness Recommended joint spacing Practical layout
    4 inch about 8 to 10 feet residential driveways, sidewalks, patios
    5 inch about 10 to 12 feet heavier driveways, RV parking
    6 inch about 12 to 15 feet shop and pole barn slabs, truck traffic

    A standard two-car driveway is roughly 20 by 20. On 4 inches that is four panels, not one big field with a joint down the middle. I see 12 and 14 foot panels in 4-inch residential work around here constantly, and those slabs crack through the middle of the panel within a couple of winters. Nothing was wrong with the concrete. There was just too much of it between relief points.

    Panel shape is the other half of it

    Spacing alone does not save a slab if the panels are the wrong shape. CIP 6: “All panels should be square or nearly so. The length should not exceed 1.5 times the width. Avoid L-shaped panels.”

    Long skinny panels crack across the middle. L-shaped panels crack at the inside corner, every time, because that corner concentrates the tension. If your driveway wraps around toward a side door or widens out for a parking pad, that corner needs a joint running through it so the geometry is broken into squares and rectangles. When I lay out a job with a dogleg in it, the joint plan is the first thing I sketch, before anybody sets a form board.

    The same goes for anything sticking up out of the slab. A porch post, a column, a light pole base. The slab has to be isolated from it or the slab will crack at it.

    Depth and timing: where joints get cheated

    A joint only works if it goes deep enough to create a weakened plane. CIP 6 again: “For contraction joints, the joint groove should have a minimum depth of one quarter the thickness of the slab, but not less than 1 inch.”

    On a 4-inch slab that is 1 inch minimum. A decorative scoreline a quarter inch deep is not a control joint. It looks like one, and I have torn out plenty of slabs where the surface had pretty lines on it and the real crack ran right beside one of them because the groove never reached down into the slab.

    Timing is the other place corners get cut. There are three legitimate ways to do it, and CIP 6 gives the windows:

    • Tooled joints, run early in the finishing process and rerun later so the groove does not bond back together. This is what I use on most residential flatwork.
    • Early-entry dry-cut joints, “generally run 1 to 4 hours after completion of finishing,” and at least 1 inch deep.
    • Conventional saw-cut joints, which “should be run within 4 to 12 hours after the concrete has been finished.”

    That 4 to 12 hour window is real, and in our climate it moves. A hot August pour in Idaho Falls sets fast and wants the saw early. A 40-degree October pour in Rigby is still green the next morning. If sawing is delayed too long, the slab cracks on its own schedule before anybody shows up with a blade. If it is too early, the edges ravel. A contractor who pours at 2 p.m. and goes home without a plan for the joints that night is gambling with your slab.

    What joints do not fix

    Joints control shrinkage cracking. They do nothing about a slab that moves because the ground under it moved.

    If the base was not compacted, if the fill was dumped in one lift instead of several, if a trench crossing under the slab was backfilled loose, the slab will settle and crack regardless of a perfect joint layout. That is why my joint plan is the last 10 percent of the job and the base prep is the first 50 percent. Minimum 4 inches of compacted gravel, placed in lifts on questionable soils, before any steel goes down.

    Steel does not prevent cracks either. I use rebar, number three or number four on an 18-inch grid, and it earns its keep by holding a cracked slab together and keeping the two sides level with each other. Wire mesh does not do that job. CIP 6 is blunt about mesh: “Note that wire mesh will not prevent cracking. Mesh tends to keep the cracks and joints from opening up.” Mesh also gets walked flat during the pour and ends up at the bottom of the slab doing nothing. If a bid comes in under my eight dollar a square foot floor, mesh instead of rebar is one of the usual reasons.

    What to ask before you sign

    Three questions, and you will learn more than an hour of reading reviews.

    1. What is my joint layout? A contractor who knows the trade can tell you where the lines will fall and why, before the pour. If the answer is “we will figure it out when we get there,” that is your answer.
    2. How deep, and tooled or sawed? You are listening for one quarter of the slab thickness, and a specific plan for when the joints happen relative to finishing.
    3. How are you isolating the slab from the house, the garage slab and the sidewalk? Driveways, patios and walks need to move independently from footings, walls and each other. Premolded filler at those edges, not a bonded butt joint.

    Frequently asked questions

    Are control joints the same as expansion joints?

    No. Control or contraction joints are grooves cut into one slab to control where it cracks. Isolation or expansion joints separate a slab from something else, a wall, a footing, a garage slab, a sidewalk, so the two can move independently. Most residential jobs need both.

    How far apart should joints be on a 4-inch driveway?

    About 8 to 10 feet, following the 24 to 36 times thickness rule, and never more than 15 feet. On a typical 20-foot wide driveway that means panels, not halves.

    My slab cracked right next to a joint. Why?

    Usually the joint was too shallow to create a real weakened plane, so the concrete found its own path a few inches away. Decorative scorelines get blamed for this a lot. A groove under an inch deep on a 4-inch slab is not doing structural work.

    Can joints be added to an existing slab?

    They can be saw-cut after the fact, and sometimes that helps a slab that is still sound but under-jointed. It will not undo cracks that already formed, and it is not a fix for settling. Have somebody look at the slab before spending money on cuts.

    Do I need to seal the joints?

    On exterior flatwork here, yes, and it is cheap insurance. Open joints collect water, snowmelt and de-icing salt, and that is exactly the recipe for freeze-thaw damage at the joint edges. Cleaning and resealing joints is one of the few maintenance items on concrete that actually pays off.

    Get the joint plan before the concrete shows up

    If you are getting bids for flatwork in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, ask every bidder where the joints go. The honest ones will have an answer and it will sound a lot like the numbers in this post, because those numbers are not mine, they are the industry’s.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Concrete Repair Cost in Eastern Idaho: Cracks, Spalling and Sinking Slabs

    Concrete Repair Cost in Eastern Idaho: Cracks, Spalling and Sinking Slabs

    I run Skinner Customs out of Rigby, and the call I get most often between March and May starts the same way: the concrete made it through another winter and now it looks worse than it did in the fall.

    Usually the question that follows is what the repair is going to run. I am not going to publish a repair price in this post, and here is why. Repair cost is not a number per square foot the way a new pour is. Two driveways with the same cracks can be a quick afternoon on one house and a tear-out on the next, and the thing that decides which one you have is what is under the slab, not what you can see on top of it.

    So instead of a fake number, here is how I read a failing slab, what actually moves the price, and when I tell people not to spend money on a repair at all.

    The three ways concrete fails around here

    Almost everything I get called out to look at falls into one of three buckets.

    Cracks. Concrete cracks. That is not a sales dodge, it is the material. The American Concrete Institute treats some cracking as expected in normal work, which is why the industry designs where cracks go instead of pretending they will not happen. A tight crack that runs through a control joint, or a hairline that has not moved in two years, is usually cosmetic. A crack you can set a pencil in, one with a lip you can feel with your boot, or one that keeps opening season over season is telling you something underneath moved.

    Spalling. That is the surface flaking, popping or scaling off, often in sheets or dime-sized craters. This is our climate doing exactly what our climate does. Water gets into the top layer, freezes, expands and pushes concrete off from the inside. Spalling shows up worst where salt and snowmelt sit: garage aprons, the first few feet of driveway, steps, sidewalk edges along the street.

    Sinking and heaving. One section drops, or one section lifts, and now you have a trip edge between two panels. Sinking means the dirt under the slab settled or washed out. Heaving means frost got under it and lifted it. Around Rigby and out through Jefferson County, irrigation water and canal season give us more washout than people expect.

    Which of those is actually a base problem

    Here is the short version I give people standing in the driveway.

    Spalling is a surface and mix problem. Cracks can be either. Sinking and heaving are always a base problem.

    That matters because repairing the surface of a slab whose base failed is throwing money away. You can grind, patch, resurface and seal a panel that is sitting on a void, and the void does not care. It will show back up the next spring, and now you have paid twice.

    The code language on base prep is specific. The 2018 IRC as adopted in Idaho says at R506.2.2:

    “A 4-inch-thick (102 mm) base course consisting of clean graded sand, gravel, crushed stone, crushed concrete or crushed blast-furnace slag passing a 2-inch (51 mm) sieve shall be placed on the prepared subgrade where the slab is below grade.”

    Four inches of clean, compacted base. That is the floor, not the goal. On questionable soil, and we have plenty of it in this valley, I build it up in lifts and compact each one. When I tear out a failed slab and find three inches of dirt-contaminated gravel that was never compacted, I already know why I am standing there.

    What actually drives the cost of fixing it

    When I price concrete work on a repair call, these are the things that move the number.

    How much has to come out. Concrete is cheap compared to labor and haul-off. Breaking out, loading and hauling an old slab is real work, and a panel against a house, a fence line or a finished landscape is slower than one sitting in the open.

    Access. If a truck can back up to it and chute directly, that is one price. If we are wheeling it in with buggies or pumping it, that is another. A backyard patio behind a narrow gate costs more than a front driveway every time.

    Thickness and what it carries. A four-inch walk is not a six-inch driveway apron with a trailer parked on it. Thicker means more concrete, more base work and more steel.

    Steel. We use rebar, number three or number four on an eighteen-inch grid. Not wire mesh. Mesh gets walked on during the pour, lifts out of position, and you end up with steel sitting at the bottom of the slab doing nothing where the cracks form. If somebody is cheaper than me and the plan says mesh, that is part of why.

    Mix. Four thousand PSI minimum for our freeze-thaw cycles. A weaker mix saves a few dollars a yard and buys you the spalling conversation in five years.

    Matching what is already there. Patching into colored or stamped concrete is the hardest thing on this list. Color cures differently at different ages, so a patch on a ten-year-old stained patio will never be invisible. Sometimes the honest answer is replacing a whole panel so the seam lands at a joint instead of in the middle of a field.

    Mobilization. A small repair carries the same trip, the same crew showing up and the same minimum as a bigger one. That is why one cracked panel often prices out closer to a whole driveway than people expect, and why bundling repairs into one visit is cheaper than three calls across two years.

    When I tell people not to repair

    I will say this plainly even though it costs me work sometimes.

    If the slab is sitting on a failed base, if it is already thin, if it was poured on mesh and is cracked in more than one direction, or if more than about a third of it is bad, patching is a payment plan on the same problem. Tear it out and pour it right once.

    My floor on new flatwork is eight dollars a square foot, and it goes up from there with thickness, access and finish. I publish that number because anybody quoting you under it is taking it out of somewhere you cannot see: a thinner slab, mesh instead of rebar, skipped compaction, or a weaker mix. When a repair starts creeping toward replacement money, you are better off putting it toward concrete that starts over with the base.

    One more thing I will not sell you. Lifting a sunken slab with foam or mud is a specialty rig and it is not what I do, so if that is genuinely your best option I will tell you that and you should call an outfit that does it all day. What I will not do is skim-coat over a heaving panel, pretend an overlay fixes a structural crack, or saw-cut new loops into a slab and call it a repair.

    Frequently asked questions

    Is a crack in my driveway a problem or just cosmetic?
    Check three things: width, whether it has a vertical lip, and whether it has grown. Tight, flat and stable is usually cosmetic and can be sealed. Wide, lipped or growing means something moved underneath and sealing it just hides it.

    Why is my concrete flaking off in sheets?
    That is spalling, and in our climate it is almost always freeze-thaw damage made worse by de-icing salt, a weak surface, or water that was overworked into the finish. Sealing good concrete prevents it. Sealing already spalling concrete does not reverse it.

    Can you just patch one section of my driveway?
    Sometimes, and the seam will show. The better version is replacing full panels so the new edges land on existing joints. On colored or stamped work, expect a visible difference no matter who does it.

    How long should a concrete driveway last in Eastern Idaho?
    Built right, with compacted base, rebar and a four thousand PSI mix, decades. Built on mesh and uncompacted fill, you can be looking at cracks inside five years. Nearly every short-lived slab I tear out failed from the bottom up, not the top down.

    Is it cheaper to repair or replace?
    Repair wins when the damage is isolated, the base is sound and the slab has thickness left. Replacement wins when the base failed, the slab is thin, or the bad area is a third or more of the surface. Anybody who answers that without looking under the slab is guessing.

    Get somebody to look at it before you spend money

    If you have concrete going bad in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, have it looked at before you buy a repair. Half the calls I go on end with me telling the homeowner their slab has years left and all it needs is a joint cleaned out and sealed.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Concrete ADA Ramp Requirements in Idaho (and What Drives the Cost)

    Concrete ADA Ramp Requirements in Idaho (and What Drives the Cost)

    An ADA ramp concrete pour is the one job where the design is mostly decided before anybody looks at the site. The rise sets it. Measure from the finished grade where the ramp starts up to the landing or threshold at the top, and that number tells you how long the ramp has to be, how many landings it needs, and whether it fits where you want to put it.

    I run Skinner Customs out of Rigby and I pour ramps on both sides of the line: commercial entries that have to meet the standard on paper, and homes where somebody needs to get a wheelchair or a walker to the front door without a fight. The code math is the same. What changes is who is checking it.

    The rise decides the ramp, not the space you have

    The federal standard caps ramp slope at 1:12. One inch of rise needs twelve inches of run. That single ratio is where most ramp plans fall apart.

    Work a real example. Your front door landing sits 24 inches above the sidewalk. At 1:12 that is 24 feet of sloped concrete, minimum, and that is before the landings. You need a level landing at the bottom and another at the top, each at least 60 inches long, so you are looking at roughly 34 feet of straight-line footprint for a two-foot rise.

    Most front yards in Rigby and Idaho Falls do not have 34 feet of straight run between the door and the drive. That is why ramps turn. Every change of direction needs a level landing at least 60 inches by 60 inches, and a switchback eats more square footage than people expect.

    The standard also caps a single run at 30 inches of rise. Go higher than that and the ramp breaks into two runs with a landing between them, whether you want the landing there or not.

    Where the ADA applies, and where it does not

    Worth being straight about this, because it changes what you are obligated to build.

    The Americans with Disabilities Act covers places of public accommodation and commercial facilities. A church, a clinic, a storefront, an office, a restaurant. If your building is open to the public, the standard is not advice, it is the requirement, and an inspector or an attorney can hold you to it.

    A private single-family home is not covered by the ADA. Nobody is going to cite you for a 1:10 ramp at your own front door.

    That said, I build residential ramps to the same standard anyway, and I would push you to do the same. A ramp steeper than 1:12 is one a person in a manual chair cannot get up without help, and it is the one that gets away from them coming down. Pouring it a little longer is cheaper than pouring it twice.

    The numbers the standard sets

    These are the figures I design to, straight out of the U.S. Access Board guidance on ramps:

    Item Requirement
    Running slope 1:12 maximum (section 405.2)
    Cross slope 1:48 maximum (405.3)
    Clear width 36 inches minimum, measured between handrails where they exist (405.5)
    Maximum rise per run 30 inches (405.6)
    Landings Level, at least as wide as the run and 60 inches long; 60 by 60 inches where the ramp changes direction (405.7)
    Handrails Required on both sides when the rise is greater than 6 inches (405.8)
    Edge protection Curbs at least 4 inches high, a barrier, or the surface extended at least 12 inches past the inside face of the handrail (405.9)
    Surface Firm, stable and slip resistant

    Two more worth knowing. A walking surface sloped 1:20 or flatter is not a ramp at all under the standard, it is a walk, and it needs no handrails or edge protection. Sometimes the smartest move on a shallow rise is to regrade and pour a long gentle walk instead of a ramp. And on an alteration to an existing building where the space genuinely is not there, the standard allows up to 1:10 for a rise of 6 inches or less, or 1:8 for 3 inches or less. Those are exceptions for existing buildings, not a starting point for new work.

    A ramp is not flatwork, and the dirt is why

    A patio sits on the ground and stays there. A ramp is a sloped structure with footings under it, and it has to hold its shape for thirty years while the ground underneath freezes and thaws.

    What goes into my ramps:

    • Footings below frost depth. Around here that means 36 inches and up. Confirm the number with the building department in Jefferson, Bonneville or Madison County, because the approved plan carries it and the inspector reads the plan.
    • Compacted gravel base, 4 inches minimum, placed in lifts and compacted each lift. More on fill or questionable soil. A ramp has the most to lose from a soft spot, because a half inch of settlement on a sloped slab shows up as a crack and a trip hazard.
    • Rebar only. Number 3 or number 4 on an 18-inch grid. Wire mesh lifts out of position during the pour and leaves you cracking at the joints, and on a ramp with a curb and a landing that is exactly where you do not want it.
    • 4,000 PSI minimum for this climate and its freeze-thaw cycles.
    • Broom finish across the slope. Traction matters more here than anywhere else on the property. Smooth troweled concrete on a 1:12 slope in February is a liability.
    • Drainage designed in. Water has to run off the landing, not sit on it.

    What Eastern Idaho winters do to a sloped slab

    A ramp is the first thing to ice over and the last thing to dry out. It catches the water coming off the roof and the walk above it, and the bottom landing is usually the low spot in the whole approach.

    So base prep and drainage are not upsells on a ramp, they are the job. I would rather spend the money under the concrete than come back in three years to a heaved landing.

    One more thing, same as every new pour: keep de-icing salt off it the first winter. New concrete has not finished gaining strength, and chloride on a green slab scales the surface. Use sand for traction that first season.

    What actually drives the price

    Nobody quotes a ramp off a photo. These are the things that move the number, roughly in the order they move it:

    1. Total rise. This is the big one. Rise sets length, length sets square footage, and a two-foot rise is double the concrete of a one-foot rise before you add anything else.
    2. Landings and turns. Each landing is flat square footage that carries no slope, and a switchback adds forming and edge work on top of it.
    3. Wall height alongside the ramp. A ramp cut into a slope needs curbs or short stem walls on the sides. The taller those get, the more forming, rebar and concrete go in.
    4. Demolition. Taking out existing steps, a walk or an old apron first is its own line item, hauling included.
    5. Site access. Whether the truck can get a chute to the forms, or the pour has to be wheeled or pumped.
    6. Soil and fill. How deep good ground is, and whether a soils report is in play.
    7. Handrails. Required over a 6-inch rise, and usually a separate trade from the concrete. Ask whoever is bidding your ramp whether rail is in or out of the number. That is the most common surprise on a ramp bid.
    8. Finish. Broom is included. Color, stamped borders or exposed aggregate are extra.
    9. Permit and engineering. A commercial ramp often needs stamped drawings and an inspection. A residential ramp usually does not. Your building department has the final say.

    Why there is no per-ramp price on this page

    Because a ramp price written without a rise is a guess that reads like a quote.

    I have put real numbers on this blog for driveways, patios, flatwork, slabs and foundations, because those price by the square foot and the square footage is knowable from a tape measure. A ramp does not work that way. Two ramps with identical square footage can land well apart on cost depending on wall height, landings, and what has to come out first.

    Measure from the ground where the ramp will start to the top of the landing or the door threshold, tell me how much straight run you have to work with, and send a photo of the approach. That is enough for me to tell you what fits, what the standard requires there, and what the concrete costs.

    Frequently asked questions

    What is the maximum slope for an ADA ramp?

    1:12, or one inch of rise for every twelve inches of run. Alterations to existing buildings may go to 1:10 for a 6-inch rise, or 1:8 for a 3-inch rise, where space genuinely does not allow 1:12.

    How long does a ramp need to be for a 24-inch rise?

    24 feet of sloped run at 1:12, plus a level landing at the top and the bottom. Figure roughly 34 feet of total footprint in a straight line, less if it switches back.

    How wide does a concrete ADA ramp have to be?

    36 inches of clear width minimum, measured between the handrails where handrails are installed.

    Do I need handrails on a residential ramp?

    The standard requires them on both sides once the rise is over 6 inches. A private home is not covered by the ADA, so it is not enforced on you there, but a ramp with any real rise and no rail is not one I would want somebody using in January.

    Does an ADA ramp need a permit in Eastern Idaho?

    Commercial work usually does, and often wants engineered drawings with it. Residential varies by jurisdiction. Call the building department for your county or city before anybody forms anything.

    Can you pour a ramp in the winter?

    Yes, with cold-weather measures, but a ramp is a job I would rather schedule in better weather when the timeline allows. The finish on a sloped slab matters more, and cold makes it harder.

    Get a number for your rise

    Measure the rise, take a picture of the approach, and send both over. I will tell you what the standard requires at that height, whether a gentle walk makes more sense than a ramp, and what the concrete runs.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.