  • Fiber Mesh in Concrete: What Synthetic Fibers Actually Do and Why They Never Replace Rebar

    Fiber Mesh in Concrete: What Synthetic Fibers Actually Do and Why They Never Replace Rebar

    Somewhere in the middle of collecting bids for a driveway or shop slab, someone tells you not to worry about rebar because the concrete will have “fiber mesh” in it. It sounds modern. It sounds like it does the same job for less. And the bid is lower.

    I run Skinner Customs out of Rigby, and I hear the fiber question a lot. So here is the honest version. Synthetic fibers are a real, useful product with a specific job. That job is not replacing steel. If a bid uses fibers instead of rebar to get the price down, you are not getting the same slab.

    First, fiber mesh is not wire mesh

    The names cause half the confusion. Wire mesh is the welded steel grid that comes in rolls or sheets. I have written about why I do not use it: it lifts out of position during the pour and ends up doing very little where it matters, which is how you get cracks at the joints.

    Fiber mesh is something else entirely. It is not a grid at all. It is millions of short plastic fibers mixed right into the concrete.

    What synthetic fibers are

    The National Ready Mixed Concrete Association covers this in its bulletin CIP 24, Synthetic Fibers for Concrete. They describe the fibers as manufactured polymer materials such as polypropylene, nylon or polyethylene, built to hold up in the alkaline environment inside concrete.

    “Synthetic fibers are added to concrete before or during the mixing operation.”

    NRMCA also notes that “The use of synthetic fibers at typical addition rates of 1 to 2 lbs per cubic yard does not require any modification to concrete mixtures.” At higher rates the mix gets stiffer, and admixtures may be needed to keep it workable.

    There are two kinds. Micro fibers are the fine ones used at those low rates. Macro synthetic fibers are thicker and used at higher dosages, NRMCA says around 5 pounds per cubic yard, for more crack control in hardened concrete.

    What fibers are good for

    The real benefit is in the first hours, while the concrete is still plastic. Fresh concrete shrinks and settles as it loses water, and that can open up small cracks before it ever sets. That is plastic shrinkage cracking, which I covered in my post on hairline cracks in new concrete. NRMCA explains how fibers help:

    “The growth of these micro shrinkage cracks is inhibited by mechanical blocking action of the synthetic fibers.”

    The fibers are spread through the whole mix, so they help hold the concrete together while it is weakest. NRMCA lists these benefits:

    • reduced plastic settlement cracks
    • reduced plastic shrinkage cracks
    • increased toughness and impact resistance
    • energy absorption

    The bulletin also notes that the evenly spread fibers discourage the larger channels bleed water cuts on its way up to the surface, which can become locations for cracking later.

    That is useful. On a hot, windy Eastern Idaho afternoon, anything that fights early surface cracking helps.

    What fibers cannot do

    This is the part that gets left out of the low bid. NRMCA includes a list titled “Do Not Use Synthetic Fibers For”. A few lines from it, word for word:

    “Control of cracking as a result of external forces.”

    “Replacement of any moment-resisting or structural steel reinforcement.”

    “Decreasing the thickness of slabs on grade.”

    “Increasing control joint spacing.”

    Read those again with a driveway in mind. External forces are the loaded truck, the trailer, the frost heave, the settling soil at the edge. Structural steel reinforcement is the rebar. Slab thickness and joint spacing are where corners get cut to save money. NRMCA is telling you fibers do not let a contractor pour thinner, space joints farther apart, or skip the steel.

    Even macro fibers, which NRMCA says can act as non-structural temperature and shrinkage reinforcement in some uses, need documentation and testing to back that up. That is a long way from “fiber mesh, so no rebar.”

    Why I pour rebar every time

    Concrete is strong in compression and weak in tension. It is going to crack at some point. Every slab does. The question is what happens after it cracks.

    Rebar is what holds the pieces together and in plane when it does. That matters a lot here, where we get deep frost, freeze-thaw cycles all winter and soils that move. A slab with rebar that cracks at a joint or across a corner stays tight and level. A slab without it can open up, shift and turn into a tripping edge or a water channel.

    So on every slab I pour, the standard is:

    • Rebar, #3 or #4 on an 18-inch grid, held up in the slab on chairs so it is actually in the middle where it does its job.
    • 4,000 PSI minimum for our freeze-thaw climate.
    • A compacted gravel base, at least 4 inches, in multiple lifts where the soil is questionable.
    • Control joints cut at the right spacing and depth, on time.

    If fibers are in a mix, they are in addition to all of that, never instead of any of it.

    How to read a bid that mentions fibers

    If you are comparing bids and one says “fiber mesh” while another says rebar, ask these:

    1. Is there steel in the slab too? If the answer is no, you have your answer.
    2. What thickness? Fibers should not mean a thinner slab. NRMCA says so directly.
    3. What joint spacing? Fibers should not mean fewer joints.
    4. What base prep? Shortcuts tend to travel together. A no-rebar bid is often a thin-base bid.

    Bids that come in well under the going rate usually got there by taking something out. Fibers instead of rebar is one of the most common places that happens.

    Frequently Asked Questions

    What is fiber mesh in concrete?

    Fiber mesh is a common name for synthetic fibers, usually polypropylene, nylon or polyethylene, mixed into concrete. It is not a grid like wire mesh. The fibers are spread throughout the concrete to reduce early shrinkage and settlement cracking.

    Can fiber mesh replace rebar?

    No. NRMCA lists replacement of structural steel reinforcement as something synthetic fibers should not be used for. Fibers help with early-age cracking. Rebar holds the slab together after it cracks.

    Does fiber mesh stop concrete from cracking?

    It reduces plastic shrinkage and plastic settlement cracks while the concrete is fresh. It does not control cracking from external loads, frost heave or settlement, and it does not replace control joints.

    Is fiber mesh the same as wire mesh?

    No. Wire mesh is a welded steel grid. Fiber mesh is short plastic fibers mixed into the concrete. Neither one is a substitute for properly placed rebar on a driveway or shop slab.

    Do fibers let you pour a thinner slab?

    No. NRMCA specifically says synthetic fibers should not be used to decrease the thickness of slabs on grade or to increase control joint spacing.

    Should I pay extra for fibers in my concrete?

    Fibers can help with early surface cracking, especially in hot or windy weather. Just make sure they are an addition to rebar, proper thickness, a good base and correct joints, not a reason to skip any of them.

    Comparing concrete bids?

    If you are in Rigby, Idaho Falls, Rexburg, Ammon or Shelley and you are trying to figure out why one bid has rebar and another has fiber mesh, send it over. I will tell you straight what is in it and what is missing.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Concrete Blisters and a Hollow-Sounding Slab: What Delamination Is and How to Avoid It

    Concrete Blisters and a Hollow-Sounding Slab: What Delamination Is and How to Avoid It

    A few weeks after a new shop or garage floor goes in, the owner notices small bumps on the surface. Some are the size of a dime, some the size of a coaster. Then one cracks open under a tire and there is a hollow pocket under a thin skin of concrete. Or there are no bumps at all, but a section of the floor sounds different when you drop a wrench on it. Dull. Hollow.

    That is blistering and delamination. I run Skinner Customs out of Rigby, and while these two problems are less common than cracks or scaling, they are some of the most frustrating, because the slab looked perfect on pour day. The cause is almost always timing during finishing, and it is very preventable.

    What concrete blisters are

    The National Ready Mixed Concrete Association explains this in CIP 13, Blisters on Concrete Slabs:

    “Blisters are hollow, low-profile bumps on a concrete slab surface”

    NRMCA says they run from about a quarter inch to 4 inches across, with a dense skin of mortar roughly an eighth of an inch thick sitting over a void. They can show up shortly after finishing, but in a dim garage or shop, small ones often go unnoticed until they break under traffic.

    What delamination is

    Delamination is the same problem on a bigger scale. From the companion bulletin, CIP 20, Delamination of Troweled Concrete Surfaces:

    “Delaminations are separations of thin layers of the slab surface from the base concrete.”

    They typically break off in layers an eighth to a quarter inch thick, and the bulletin says they can range from a few square inches to many square feet. In NRMCA’s words, “Delaminations are similar to blisters, but much larger”.

    Here is the simple test you can do yourself:

    “On a finished slab, delaminations can be detected by a hollow sound when tapped with a hammer or with a heavy chain drag.”

    Tap the floor with a hammer every foot or so. Sound concrete rings solid. A delaminated area sounds dull and hollow. Mark the edges with chalk and you will have a map of the problem.

    Why blisters and delamination happen

    Both come from the same thing. Fresh concrete is still pushing air and bleed water up toward the top as it settles. If the surface gets sealed off before that air and water are out, they get trapped under a thin, dense crust. That crust is the blister, or the delaminated layer.

    The surface usually gets sealed early for one of two reasons. Either the crew started troweling too soon, or the top of the slab stiffened faster than the concrete below it, so it looked ready when it was not. NRMCA’s advice to finishers:

    “The finisher should be wary of a concrete surface that appears to be ready for final finishing before normally expected.”

    And from the delamination bulletin:

    “A slab without bleed water on the surface may not be ready to trowel.”

    So what makes the top stiffen early? The bulletins list the usual causes, and several of them describe a normal day in Eastern Idaho.

    1. Wind, sun and dry air. NRMCA lists high wind, low humidity, rising temperatures and direct sunlight as factors that stiffen the surface. Wind out here can dry the top of a slab in minutes while the inside is still soft.

    2. A cold subgrade. When the ground under the slab is colder than the concrete, the top sets faster than the bottom. NRMCA calls this top-down stiffening. In our shoulder seasons, with frosty mornings and warm afternoons, that is a real risk. The delamination bulletin recommends avoiding placing concrete on a substrate colder than 40 degrees F, and the blister bulletin says that in cold weather the subgrade should be heated.

    3. A vapor barrier right under the slab. Plastic under the slab means bleed water cannot drain down into the base, so more of it comes up, for longer. NRMCA lists placing a slab directly on a vapor retarder as a cause of both problems. That does not mean skip the vapor barrier on an interior floor that will get a covering. It is required there, and I covered why in my vapor barrier post. It means the crew has to respect the longer bleed time and not start finishing early.

    4. Air entrainment on a troweled floor. Air-entrained concrete is the right call outside, for freeze-thaw durability. But it bleeds less and slower, so the surface can look ready too soon. NRMCA is direct about interior slabs:

    “Air entrained concrete should not be specified for floor slabs that will receive a hard troweled finish as it increases the potential for delaminations.”

    That is why the mix for a smooth troweled shop floor and the mix for a broom finished driveway are not the same order.

    5. Overworking the surface. Excess vibration or too much floating works up a thick layer of mortar on top, which seals more easily. Tilting trowel blades too steeply on early passes does the same thing.

    6. A sticky, overly rich mix. High cement or high fines content bleeds slower, which again makes the surface look ready before the concrete underneath is done.

    How it gets prevented

    These are straight from the NRMCA prevention lists, and they are the questions worth asking any crew pouring an interior floor.

    • Do not seal the surface early. NRMCA’s first rule for avoiding delamination is not to over consolidate or seal the surface before air and bleed water have escaped.
    • Check the set below the surface. A quarter inch boot print is the usual sign the slab is ready to trowel, and the bulletin suggests pushing a sharp object into the surface to make sure the concrete underneath is not still plastic.
    • Keep the floats flat early. Flat blades on the first float pass so the surface stays open.
    • Slow the surface drying, not the crew. On windy or hot days, NRMCA recommends covering with plastic or using evaporation retarders or fog sprays so the top does not crust over.
    • Warm concrete in cold weather. Concrete over 50 degrees F with an accelerating admixture, so the slab sets evenly through its depth.
    • Right mix for the finish. Non-air-entrained concrete for hard troweled interior floors, a slump in the 3 to 5 inch range, no extra water at the truck.
    • Enough crew. NRMCA notes the crew size should be adequate for the area so parts of the slab are not finished too early just to keep up.

    Can blisters and delamination be repaired?

    Yes, but it is not quick. NRMCA says blisters “are not easily repaired after concrete hardens.” For delamination, the bulletin says:

    “Delaminated surfaces can be repaired by patching after the surface layer is removed and the underlying concrete is properly cleaned.”

    In practice that means mapping the hollow areas, cutting or chipping out the loose layer, cleaning down to sound concrete and patching with a proper repair material. When it is widespread, NRMCA says it may need grinding and a new overlay. If rusting steel near the surface caused it, the steel has to be cleaned too.

    What does not work is gluing or sealing over a hollow layer. It will keep breaking off under traffic.

    Frequently Asked Questions

    What causes blisters on a new concrete slab?

    Air or bleed water trapped under a surface that was sealed off too early by finishing, or a surface that stiffened faster than the concrete below it from wind, sun or a cold subgrade.

    Why does my concrete floor sound hollow?

    A hollow sound when you tap with a hammer usually means delamination, a thin layer of the surface separated from the concrete underneath. NRMCA describes hammer tapping and chain dragging as the standard way to find it.

    Is a delaminated slab structurally unsafe?

    Usually not. Finishing-related delamination is a surface layer problem, typically an eighth to a quarter inch thick. It is a durability and appearance issue, and it will keep breaking up under traffic until it is repaired.

    Can you fix concrete blisters?

    Small blisters caught during finishing can sometimes be worked back down. Once the concrete hardens, the loose skin has to be removed and patched, and larger areas may need grinding and an overlay.

    Does a vapor barrier cause delamination?

    A vapor barrier directly under the slab increases bleeding, which raises the risk if the crew finishes too early. It is still required under floors that will get a covering. The fix is patient finishing, not skipping the barrier.

    Should my garage floor be air-entrained?

    NRMCA recommends against air-entrained concrete for floors that get a hard troweled finish, because it increases the risk of delamination. Exterior flatwork exposed to freeze-thaw is a different case.

    Floor sounding hollow?

    If you are in Rigby, Idaho Falls, Rexburg, Ammon or Shelley and your slab has blisters, flaking or hollow spots, or you are planning a shop or garage floor and want it finished right, send me a few photos and I will tell you straight what you are dealing with.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Why Is My New Concrete Blotchy? Concrete Discoloration Causes and Fixes in Eastern Idaho

    Why Is My New Concrete Blotchy? Concrete Discoloration Causes and Fixes in Eastern Idaho

    The new patio looked great the day it was poured. Two weeks later you walk out with your coffee and notice it is not one color. There are darker blotches in one corner, a lighter band down the middle, maybe some chalky white patches near the edge. Same pour, same truck, and it looks like a patchwork quilt.

    I get this call every season. I run Skinner Customs out of Rigby, and concrete discoloration is one of the most common worries I hear from homeowners after a new driveway, patio or garage floor goes in. Most of the time it is cosmetic, a lot of the time it fades, and when it does not, there are fixes worth trying before anyone talks about tearing anything out.

    Here is what is going on, what causes it, and what to do about it.

    What counts as concrete discoloration

    The National Ready Mixed Concrete Association covers this in its bulletin CIP 23, Discoloration. They describe it as color that is not uniform across a single placement. In their words:

    “It may take the form of dark blotches or mottled discoloration on flatwork surface”

    They also include large color changes across whole areas when something in the mix changed, and “light patches of discoloration caused by efflorescence”, which is the white, powdery bloom you sometimes see as moisture moves salts up to the surface.

    What it does not include is staining from something that landed on the concrete later. Rust from a sprinkler line, oil from a truck, leaves, runoff. Those are stains, and they get handled differently. Discoloration is built into the slab during the pour and the first days of curing.

    Why new concrete turns out blotchy

    There is rarely one villain. NRMCA says it plainly:

    “No single factor is identified as a primary cause for discoloration.”

    But the list of usual suspects is well known, and almost all of it comes down to water and timing.

    1. Water content at the surface. This is the big one. NRMCA notes that “Concrete with a higher w/cm will generally be lighter in color.” W/cm is the water to cement ratio. Anywhere the surface ends up with more water, it dries lighter. Anywhere it ends up with less, it goes darker. Extra water added at the truck, finishing while bleed water is still on top, or uneven drying across the slab all leave their mark in color.

    2. Hard troweling too late. The bulletin calls out trowel burning, which is hard troweling a surface after it has gotten too stiff to work properly. That densifies the surface and leaves dark, burnished patches. On a garage floor you can sometimes see the swirl pattern of the trowel in the dark spots.

    3. Uneven curing. This one surprises people:

    “Concrete which is not properly or uniformly cured may develop discoloration.”

    The classic example is plastic sheeting laid over a fresh slab. Where the plastic touches the concrete and where it puckers up, the moisture is different, and so is the color. NRMCA points out that wrinkled plastic in partial contact leads to variable hydration and variations in color, and suggests an even coat of a quality spray-on curing compound may be a better alternative.

    4. Calcium chloride that did not dissolve. Calcium chloride is a set accelerator, and it gets used in cold weather. NRMCA notes that the flake or pellet form discolors more than the liquid form when it is not mixed in evenly. That matters here, because in an Eastern Idaho shoulder season a lot of concrete gets poured with accelerator in it.

    5. A dry spot underneath. If part of the subgrade is bone dry and part of it is damp, the dry part pulls water out of the bottom of the slab faster. NRMCA’s prevention list includes moistening absorptive subgrades and protecting the concrete from drying by wind and sun. Our wind out here does not help.

    6. Changes in the mix. A change in materials partway through a big pour can shift the color. NRMCA says batch to batch variation in cement or sand is generally rare and insignificant, but it does happen, and it is more noticeable on colored concrete.

    Will the blotches go away?

    Often, yes, at least partly. NRMCA says:

    “Some types of discoloration may, however, fade with wear and age.”

    New concrete keeps curing and drying for weeks. Color that looks dramatic at day ten can look much more even at month three, especially once the slab has been through some sun and some weather. Efflorescence often washes out or wears off on its own over time.

    My advice to most homeowners is to give a new slab a full season before deciding the color is permanent, unless the blotches are tied to something else, like flaking, dusting or cracking. Those are different problems, and I have written about dusting and hairline cracks separately.

    How concrete discoloration gets fixed

    If the color has not evened out, NRMCA lays out treatments from gentle to aggressive. Always start gentle.

    Hot water and a stiff brush. For discoloration from calcium chloride and some finishing and curing problems, the bulletin recommends “repeated washing with hot water and a scrub brush.” Flush it, scrub it, let it dry overnight, and repeat until it improves. It sounds too simple, but it is the first step for a reason.

    Mild acid. If washing does not do it, the bulletin describes trying a very dilute acid. They are specific about the precautions: dampen the surface first so the acid does not soak in, and flush it off with clean water within 15 minutes. They also note that diammonium citrate solutions have been found effective for most discoloration, followed by at least 72 hours of wet curing on the treated area.

    Here is the part people skip:

    “A trial treatment on an inconspicuous area is recommended.”

    Chemical treatments can change the color of the concrete, and NRMCA warns that using them wrong can make the problem worse. Read the safety data sheet, wear gloves and eye protection, and test a hidden corner first. If you are not comfortable doing that, call someone who is.

    Paint, stain or coating. Some discoloration will not come out. NRMCA is honest about it:

    “Some types of discoloration, such as trowel burns, may not respond to any treatment.”

    In that case the options are a penetrating stain or a coating that evens out the color. On a garage or shop floor, that is often the route people want anyway.

    How I keep a new slab from turning blotchy

    None of this is magic. It comes down to doing the boring parts right every time.

    • No extra water at the truck. If the mix needs to flow better, that gets handled with the mix design, not a garden hose.
    • Wait out the bleed water. Finishing starts when the surface is ready, not when the crew is ready to go home.
    • Even subgrade moisture. On a hot or windy day a dry base gets dampened evenly before the pour.
    • Cure it evenly. Curing compound applied in an even coat right after finishing, or covers laid flat.
    • Plan colored concrete carefully. NRMCA notes that applying a texture or pattern to colored concrete can minimize the perception of color variation between loads. That is one reason stamped color tends to look more forgiving than flat color.

    Add the standards I pour to on every exterior slab, 4,000 PSI minimum for our freeze-thaw climate, a compacted gravel base of at least 4 inches, rebar and a broom finish, and you get concrete that looks right and lasts.

    Frequently Asked Questions

    Why does my new concrete have dark spots?

    Dark spots usually come from areas where the surface ended up with less water, most often from hard troweling after the concrete got too stiff, from uneven curing, or from a set accelerator that did not mix in evenly. They are almost always cosmetic.

    Why is my new concrete lighter in some areas?

    Lighter patches usually mean more water at the surface in those spots, from extra water in the mix, finishing while bleed water was still on top, or faster drying from a dry subgrade, sun or wind. White, powdery patches are often efflorescence.

    Will concrete discoloration fade?

    Often it does. Concrete keeps curing for weeks, and NRMCA notes some discoloration fades with wear and age. Give a new slab a full season before treating it, unless it is also flaking, dusting or cracking.

    How do you fix blotchy concrete?

    Start with repeated hot water washing and scrubbing. If that does not work, a dilute acid or a diammonium citrate treatment may help, tested on a hidden area first with proper safety gear. Trowel burns may not respond, and a stain or coating is the fallback.

    Is discolored concrete weaker?

    Discoloration by itself is usually a cosmetic issue, not a strength issue. If the blotchy areas also powder, flake or scratch easily with a nail, that points to a surface problem worth having someone look at.

    Does sealing concrete fix discoloration?

    A clear sealer will not even out the color, and it can lock in what is there. Sealing is for protection. If color is the problem, deal with it first, then seal.

    Not sure what you are looking at?

    If you are in Rigby, Idaho Falls, Rexburg, Ammon or Shelley and your new concrete came out blotchy, or you are planning a pour and want it to look right the first time, send me a few photos and I will tell you straight whether it is worth worrying about.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Cracks in a Poured Basement Wall: Which Ones Are Normal and Which Ones Need a Call

    Cracks in a Poured Basement Wall: Which Ones Are Normal and Which Ones Need a Call

    Sooner or later almost every homeowner with a poured basement finds one. A thin line running down the wall behind the water heater, or angling off the corner of a basement window. The first question is always the same: is my foundation failing?

    Usually not. I run Skinner Customs out of Rigby and pour foundations across Eastern Idaho. Some cracking in a poured concrete basement wall is normal and expected. A few kinds of cracks are not, and those are worth a closer look. This post walks through how to tell the difference, using the same guidance the concrete industry uses.

    Why poured basement walls crack at all

    Concrete is at its biggest the day it is poured. As it hardens and dries, it shrinks. It also grows and shrinks with temperature. A basement wall is tied to its footing and buried in soil, so it cannot move freely. When a wall wants to shrink and something holds it in place, it relieves that stress by cracking.

    The National Ready Mixed Concrete Association puts it plainly in its bulletin CIP 7, Cracks in Residential Basement Walls:

    “Some cracking is normal in concrete basement walls.”

    That is why the job is not to promise zero cracks. The job is to control where they happen and how wide they get, and to keep water from coming through.

    The common types of basement wall cracks

    NRMCA lists the usual suspects. Here is what each looks like when you are standing in your basement with a flashlight.

    Shrinkage and temperature cracks. Thin, usually vertical or close to it, often running from the top of the wall partway or all the way down. These are the most common cracks in any poured wall and come from the drying and temperature movement described above.

    Re-entrant corner cracks. Diagonal cracks coming off the corners of windows, doors or other openings. NRMCA notes that these “result from shrinkage.” Corners concentrate stress, so the crack starts there.

    Pour lines and cold joints. A horizontal line where one load of concrete met the next. NRMCA says pour lines are often perceived as cracks. If the first load had already partly hardened before the second one went in, that line can act like a crack. This is called a cold joint, and it is a workmanship issue.

    Form lines. Straight vertical lines where the wall form panels met, sometimes at the form ties. Cracks can start along them.

    Restraint cracks. Cracks near the bottom of the wall where the footing holds the wall back from shrinking.

    Settlement cracks. NRMCA ties these to non-uniform support of footings or occasionally expansive soils. These are the ones that tend to show up as wider, uneven or stair-stepped cracks, and they are the ones to take seriously.

    Backfill cracks. Structural cracks that happen during backfilling when the wall is not strong enough yet or not braced, often when heavy equipment works too close to the wall. Horizontal cracks partway up a wall belong in this group, and they need a professional look.

    When a crack is worth worrying about

    This is the part most people actually want. NRMCA gives a useful benchmark from how warranties are typically written:

    “A typical warranty will require repair only when cracks leak, have measurable vertical displacement, or if the crack width exceeds 1/8-in. (3 mm).”

    That gives you three simple checks:

    1. Is it leaking? Water, dampness, white mineral staining or rust lines along the crack.
    2. Is one side offset from the other? Run your finger across the crack. If one side sticks out past the other, that is displacement.
    3. Is it wider than an eighth of an inch? A standard credit card is a lot thinner than that. If a nickel edge slides into the crack easily, it is getting wide.

    Add a fourth of my own: is it growing? Mark the ends of the crack with a pencil and write the date next to it. Take a photo with a tape measure across it. Check again in a few months. A crack that holds still through a full winter and spring is a very different animal from one that keeps getting longer or wider. NRMCA’s guidance is to seek professional advice for active cracks that are widening with time.

    A thin vertical crack that is dry, flush, and not changing is usually just a shrinkage crack doing what concrete does.

    How a basement wall should be built to limit cracking

    Most of the bad cracks above trace back to decisions made before and during the pour. NRMCA’s list of construction steps is a good checklist for anyone building a home with a basement in our area.

    • Compacted, uniform support. The bulletin says footings must bear on undisturbed soil or well compacted fill, and that soil or fill under the basement should be well compacted by rolling, vibrating or tamping. Uneven support is where settlement cracks come from.
    • Reinforcement and wall thickness to code. NRMCA says reinforcement “is used to control crack width” and that wall thickness and steel should follow the International Residential Code, ACI 332 or the local code. Rebar does not stop concrete from shrinking. It keeps the cracks that form tight.
    • The right concrete, no extra water. NRMCA says excess water should not be added in the truck mixer and that air-entrained concrete should be used for walls exposed to moisture and freezing temperatures. Every foundation I pour is 4,000 PSI minimum because of our freeze-thaw cycles.
    • Continuous placement. Placing in a continuous operation avoids cold joints. That takes planning, enough trucks on schedule and enough crew.
    • Curing, and forms left on. NRMCA recommends leaving forms in place 5 to 7 days or at least until the concrete can support itself, and insulating forms with blankets in cold weather. Fall and winter foundation pours in Eastern Idaho need that protection.
    • Waterproofing and drainage. Exterior waterproofing, drain tile around the footing, and surface water directed away from the house. NRMCA notes that exterior waterproofing is generally better than interior for keeping water from coming through cracks.
    • Careful backfill and grading. Backfill gently, brace the walls or backfill after the floor system is on, and slope the finished grade away from the house. NRMCA calls for a slope of ½ to 1 inch per foot for at least 8 to 10 feet.

    That last one is the most common problem I see on homes that are a few years old. The backfill settles, the grade flattens out or tips back toward the house, and water that used to run away now sits against the wall. A crack that was dry for years suddenly leaks.

    Fixing a crack

    If a crack does need attention, NRMCA lists epoxy injection, dry-packing, and routing and sealing as common repair methods. The bulletin also makes a point people skip: before repairing leaking cracks, check the drainage around the structure and correct it if necessary. Sealing a crack while water keeps pooling outside the wall just moves the leak.

    And keep this line from the bulletin in mind: “Cracking is not necessarily a sign of poor materials or workmanship or a structural problem with the concrete wall.”

    Frequently Asked Questions

    Are cracks in basement walls normal?

    Some are. NRMCA says some cracking is normal in concrete basement walls because concrete shrinks as it dries and moves with temperature. Thin, dry, vertical cracks that are not growing are usually shrinkage cracks.

    What size basement wall crack is a problem?

    A common benchmark is a crack wider than 1/8 inch, a crack where one side is offset from the other, or any crack that leaks. Those are the conditions typical basement warranties treat as needing repair, according to NRMCA.

    Are horizontal cracks in a basement wall serious?

    They deserve a professional look. Horizontal cracks partway up a wall can come from soil or backfill pressure pushing on the wall. Stair-step, wide or offset cracks also point to movement and should be evaluated.

    Why is there a crack at the corner of my basement window?

    That is a re-entrant corner crack. NRMCA says these run diagonally from the corners of openings and result from shrinkage. If it is thin, dry and not growing, it is common.

    Can a leaking basement crack be fixed from the inside?

    Inside repairs like injection can stop many leaks, but fix the outside drainage first. If water keeps pooling against the wall because the grade slopes toward the house or the downspouts dump next to the foundation, the leak tends to come back.

    How do I know if a basement crack is getting worse?

    Mark both ends with a pencil, write the date, and photograph it with a tape measure across the widest point. Check it every few months. If it gets longer, wider, or one side starts to stick out, have it evaluated.

    Building a home with a basement?

    If you are planning a foundation in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, or you have a crack in a poured wall and want an honest read on it, call me and I will tell you straight what you are looking at.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Why Is My Concrete Floor Dusty? Concrete Dusting Causes and Fixes in Eastern Idaho

    Why Is My Concrete Floor Dusty? Concrete Dusting Causes and Fixes in Eastern Idaho

    You sweep the garage floor on Saturday. By Wednesday there is a fine gray powder on it again. Your boots track it into the house, it settles on everything on the shelves, and the floor looks worn down like it is fifty years old when it is barely five.

    That is concrete dusting, and it is not normal. A properly built concrete floor should not keep making its own dust.

    I run Skinner Customs out of Rigby, and I see dusting most often in garages, shops and basements that were poured in a hurry or in bad weather. The cause is almost always decided on pour day. The good news is that the fixes are well known, and if you are about to pour a new floor, it is one of the easiest problems to avoid.

    What concrete dusting is

    The National Ready Mixed Concrete Association covers this in its bulletin CIP 1, Dusting Concrete Surfaces. Their definition:

    “Formation of loose powder resulting from disintegration of surface of hardened concrete is called dusting or chalking.”

    They give two signs, and you can check both in about thirty seconds. A dusting floor powders under any kind of traffic, and it can be easily scratched with a nail or even by sweeping.

    Try it. Take a nail or a key and drag it across the floor with firm pressure in a spot nobody will see. A sound floor leaves a light mark. A dusting floor leaves a groove and a little pile of powder.

    Why concrete floors dust

    The short version, straight from the bulletin:

    “A concrete floor dusts under traffic because the wearing surface is weak.”

    The concrete a foot down might be perfectly strong. It is the top skin, the part you actually walk and drive on, that failed. NRMCA lists the usual reasons, and every one of them happens on pour day or in the week after.

    1. Finishing while bleed water is on the surface. Fresh concrete pushes water up to the top as it settles. If a crew floats or trowels while that water is still there, they work it back into the surface. NRMCA explains that this produces “a very high water-cement ratio and, therefore, a low strength surface layer.” That is the single most common cause I see.

    2. Shortcuts during finishing. Throwing dry cement on a wet slab to soak up the water, or spraying water on the surface to make it easier to finish. Both are on NRMCA’s list. Both make the top weaker.

    3. Cold, damp conditions. This one matters here. The bulletin points out that cold concrete sets slowly, “in particular, cold concrete in basement floors,” and that in humid air water can condense on the fresh surface. Trowel that moisture in and you get a dusty floor. A basement or garage poured in an Eastern Idaho shoulder season, with the slab sitting cold for hours, is a setup for this.

    4. Heaters without venting. When a slab is poured in winter inside a closed building, crews often run heaters. NRMCA warns that carbon dioxide from open salamander heaters, gas engines and generators can cause carbonation, “which greatly reduces the strength and hardness of the concrete surface.” If the space is not vented, the surface can be ruined before anyone notices.

    5. Not enough curing. A slab that dries out too fast in the first days never builds a strong surface. NRMCA says insufficient curing often results in a soft surface skin that will easily dust under foot traffic.

    6. Freezing. The bulletin also notes that allowing the concrete surface to freeze will weaken the surface and result in dusting. Fresh concrete in our climate has to be protected, period.

    Notice what is not on the list: the homeowner. Unless you are sandblasting your own floor, dusting was built in.

    How dusting is prevented on a new floor

    If you are planning a garage, shop or basement slab, these are the things to ask about. They come from NRMCA’s prevention list, and they are how I run an interior pour.

    • Moderate slump, not soup. NRMCA recommends concrete with a moderate slump “not exceeding 5 inches” unless the mix is designed for more. No extra water at the truck to make spreading easier.
    • No finishing while it bleeds. The crew waits until the bleed water is gone before the next pass. NRMCA’s advice for removing bleed water is simple: drag a garden hose across the surface. Never dry cement.
    • Watch the vapor barrier detail. Interior slabs that will ever get a floor covering need a vapor retarder, and I covered why in my vapor barrier post. NRMCA notes that placing concrete directly on plastic can contribute to dusting, scaling and cracking, and that when it has to go directly on plastic, special care is needed so finishing happens only after all bleed water is gone. That is a timing issue the crew has to respect.
    • Cure it. Curing compound or wet covering right after finishing. NRMCA’s rule is to retain moisture in the concrete for the first 3 to 7 days and protect it from freezing.
    • Cold weather means warm concrete. For cold-weather placement, NRMCA calls for concrete temperatures over 50 degrees F along with an accelerating admixture, plus vented heat if the space is enclosed.

    Add the basics I hold every slab to, 4,000 PSI minimum, a compacted gravel base and rebar, and a dusty floor should never happen.

    How a dusting floor gets fixed

    If you already have a dusty floor, it is not hopeless. NRMCA lays out the repair options from light to heavy:

    1. Remove the weak layer. Sandblasting, shot blasting or a high-pressure washer to get the soft surface off.
    2. Chemical hardener. On a mild case, a commercial floor hardener applied to clean, thoroughly dried concrete per the manufacturer’s directions. NRMCA names sodium silicate and metallic zinc or magnesium fluosilicate as examples.
    3. Coating. If dusting keeps coming back after a hardener, the bulletin suggests a coating such as a latex formulation, epoxy sealer or cement paint.
    4. Grind it down. In severe cases, wet-grinding to sound concrete, sometimes followed by a bonded topping.
    5. Cover it. As a last resort, a floor covering. NRMCA cautions that adhesives will not bond to a dusting floor without prep, and dust can come through carpet.

    One warning from experience: a coating will only stick as well as the surface under it. If the top of the slab is powder, a coating rolled over it is bonding to powder. The weak layer has to come off first.

    Which fix is right depends on how deep the weakness goes. Do the nail test in a few spots and note how easily it scratches. That tells you a lot.

    Frequently Asked Questions

    What is concrete dusting?

    Concrete dusting, also called chalking, is a weak top layer on hardened concrete that keeps breaking down into fine powder under traffic. NRMCA describes a dusting floor as one that powders under traffic and scratches easily with a nail or even by sweeping.

    Why does my garage floor keep getting dusty?

    Usually because the surface was finished while bleed water was still on it, dried out too fast, froze, or was hit with exhaust from unvented heaters during the pour. All of those leave a weak skin on top of otherwise sound concrete.

    Will sealing stop concrete dusting?

    A penetrating chemical hardener can stop mild dusting on a clean, dry floor. Heavier dusting usually needs the weak surface removed first. Rolling a sealer or coating over loose powder rarely holds up.

    Can I fix concrete dusting myself?

    A mild case can sometimes be handled with a good cleaning and a commercial floor hardener applied exactly to the label. Shot blasting, grinding or overlays are equipment-heavy jobs for a pro.

    Does dusting mean my slab is weak all the way through?

    Not usually. Dusting is a surface problem. The concrete below the top fraction of an inch is often perfectly sound, which is why removing the weak layer works.

    How do I keep a new garage floor from dusting?

    Ask your contractor about slump, when they start finishing, how they will cure it, and how they will keep it from freezing or being hit with heater exhaust. A crew with good answers to those four questions will not give you a dusty floor.

    Tired of sweeping the same floor?

    If you are in Rigby, Idaho Falls, Rexburg, Ammon or Shelley and your garage, shop or basement floor keeps turning to powder, or you are planning a new slab and want it right the first time, send me a few photos and I will tell you straight what you are dealing with.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Hairline Cracks in New Concrete: Plastic Shrinkage, Crazing and What Is Normal

    Hairline Cracks in New Concrete: Plastic Shrinkage, Crazing and What Is Normal

    You walk out the morning after your new patio or driveway was poured, coffee in hand, and there they are. Thin little lines in the surface that were not there when the crew left. Some are short and run side by side. Some look like a spider web if you get down close.

    Your stomach drops. Did they just pour you a bad slab?

    Maybe, maybe not. I run Skinner Customs out of Rigby, and hairline cracks in new concrete are one of the most common calls I get from homeowners who had somebody else pour their slab. Most of the time the cracks are one of two things: plastic shrinkage cracks or crazing. Both are surface problems. Both are mostly preventable. Neither one usually means your slab is going to fall apart. But they tell you a lot about how the pour was run.

    Two kinds of early cracks

    Before anything else, it helps to know which one you are looking at. They look different, they show up at different times, and they come from different mistakes.

    Plastic shrinkage cracks form while the concrete is still soft, in the first few hours. They tend to run roughly parallel to each other, a foot or more apart, and they usually stop short of the edge of the slab.

    Crazing is a fine web of very shallow cracks across the surface, like the glaze on an old plate. It usually shows up the day after the pour or within the first week, and it is easiest to see when the slab is drying after rain or a hose-down.

    Real structural cracks that run the full depth of the slab, or cracks that have one side higher than the other, are a different conversation. I cover those in other posts on this blog. This one is about the surface.

    Plastic shrinkage cracks: when the top dries too fast

    The National Ready Mixed Concrete Association has a short technical bulletin on exactly this, CIP 5, Plastic Shrinkage Cracking. Here is how they describe what you are seeing:

    “Plastic shrinkage cracks appear in the surface of fresh concrete soon after it is placed and while it is still plastic.”

    And here is the cause, in one sentence:

    “The critical condition exists when the rate of evaporation of surface moisture exceeds the rate at which rising bleed water can replace it.”

    Fresh concrete is always pushing a little water up to the surface. That is called bleed water. As long as that water keeps up with what the sun and wind are pulling off the top, the surface stays wet and nothing happens. When the air pulls water off faster than the slab can replace it, the top layer shrinks while the concrete underneath has not, and it tears.

    NRMCA lists the conditions that drive evaporation up:

    • Wind velocity in excess of 5 mph
    • Low relative humidity
    • High ambient and/or concrete temperatures

    Read that list again and think about a summer afternoon in Eastern Idaho. Dry air, strong sun at elevation, and wind coming across the Snake River Plain most afternoons. We check all three boxes more days than not. That is why plastic shrinkage is something I plan for on every summer pour, not something I react to.

    The good news, from the same bulletin:

    “Plastic shrinkage cracks are unsightly but rarely impair the strength of concrete floors and pavements.”

    The caution is that they are open doors. NRMCA notes they can let in aggressive chemicals and act as weak points where later cracking starts. On a driveway that is going to see snowmelt and road brine, that matters.

    How a good crew prevents plastic shrinkage cracks

    None of this is exotic. It is planning and having enough hands on site. These are the measures NRMCA lays out, and what they look like on a real job:

    1. Watch the forecast before the truck is ordered. If the afternoon is going to be hot, dry and windy, that changes the plan. Sometimes that means an earlier start. NRMCA also suggests windbreaks and sunshades when conditions are bad.
    2. Dampen a dry base. On a hot day a bone-dry gravel base will suck water out of the bottom of the slab. NRMCA says to dampen the subgrade “but not to a point that there is freestanding water prior to placement.”
    3. Keep the surface from drying between finishing steps. Evaporation retarders, fog spray, or covering the slab if there is a delay. A crew that is short-handed and falling behind is a crew that lets the surface dry out.
    4. Start curing right away. NRMCA calls for curing compound or wet covering as soon as possible, kept continuously moist for a minimum of 3 days.

    One more item on their list is synthetic fibers in the mix. Some contractors use them for surface cracking. Fibers are not a substitute for steel. Every slab I pour gets rebar, and the surface-crack prevention comes from how the pour and cure are run.

    Crazing: too much paste at the top

    Crazing comes from a different direction. NRMCA covers it in CIP 3, Crazing Concrete Surfaces:

    “Crazing is the development of a network of fine random cracks or fissures on the surface of concrete or mortar caused by shrinkage of the surface layer that is rich in paste or mortar.”

    The cracks are shallow, rarely more than an eighth of an inch deep according to the bulletin, and the little cells between them are usually an inch and a half across or smaller. NRMCA is clear that they are not structural:

    “They do not affect the structural integrity of concrete.”

    So where does that paste-rich top layer come from? Almost always from the finishing. The bulletin lists the usual causes, and they read like a list of shortcuts:

    • Adding extra water at the truck to make the concrete easier to spread
    • Over-working the surface and driving the rock down
    • Finishing while bleed water is still on the surface
    • Sprinkling dry cement on the slab to soak up bleed water
    • Spraying water on the surface to make it easier to finish
    • Late or missing curing

    Every one of those makes the top eighth of an inch weaker and richer in fine material than the rest of the slab. That layer shrinks more as it dries, and it crazes.

    If you read my post on adding water to the truck, this will sound familiar. It is the same mistake showing up in a different way.

    How crazing is prevented

    NRMCA’s prevention list is the flip side of the cause list. Place concrete at a moderate slump instead of soupy. Do not finish while there is water on the surface. Never throw dry cement on a wet slab. Do not spray water to help the finish. Start curing as soon as finishing is done, and avoid letting the surface go through wet and dry swings in the first days.

    Our exterior slabs get a broom finish as the standard, which helps here too. A broom finish leaves an open, textured surface instead of a slick, tight one, and the bulletin notes crazing is more noticeable on steel-troweled surfaces. Add a 4,000 PSI mix, a compacted gravel base, rebar and a real cure, and crazing becomes rare.

    What to do if your new slab already has them

    If the slab is already poured and you are seeing lines, here is how I would sort it out:

    • A web of tiny, shallow cracks you can barely catch a fingernail in: that is crazing. It is cosmetic. It may get more visible as dirt settles into it. Keep de-icers off it the first winter and a breathable sealer down the road can help keep water out.
    • A few straight cracks running roughly parallel, formed the first day: that is likely plastic shrinkage. Usually not a strength issue, but worth sealing so water and salt stay out.
    • Cracks that are wide, growing, cross the whole slab, or have one side higher than the other: that is not a surface issue. Get somebody to look at it.

    Either way, take photos with a coin or a tape measure in the frame and note the date. If the cracks change, you want a record.

    Frequently Asked Questions

    Are hairline cracks in new concrete normal?

    Some cracking in concrete is normal, which is why we cut control joints. Hairline surface cracks in the first day or week are usually plastic shrinkage or crazing. They are common, mostly cosmetic, and mostly preventable with good timing, finishing and curing.

    Do plastic shrinkage cracks weaken the slab?

    According to NRMCA, they “rarely impair the strength” of floors and pavements. They can let water and chemicals into the surface and become starting points for later cracks, so sealing them on an exterior slab is a good idea.

    Is crazing a structural problem?

    No. NRMCA’s bulletin says crazing does not affect the structural integrity of concrete. It is a weak, paste-rich surface layer that shrank as it dried. It is mostly a looks issue.

    Can hairline cracks be fixed?

    Plastic shrinkage cracks that open during finishing can sometimes be closed by refinishing on the spot. Once the slab has hardened, the practical step is keeping water out with a breathable sealer. You will not make them disappear.

    What causes cracks the day after concrete is poured?

    Usually the surface dried faster than the slab could replace the water, or too much water and paste ended up at the top from the mix or the finishing. Wind, low humidity, heat, extra water at the truck and late curing are the most common culprits.

    When is it too windy to pour concrete?

    There is no single cutoff, but NRMCA lists wind over 5 mph as one of the conditions that raise evaporation. On a dry, hot, windy day a good crew adjusts the start time, uses windbreaks or evaporation retarders, and has enough people to finish and cure fast.

    Seeing lines in your new slab?

    If you are in Rigby, Idaho Falls, Rexburg, Ammon or Shelley and you have a new slab with cracks you are not sure about, or you are planning a pour for spring and want it done right the first time, call me and I will tell you straight what you are looking at.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Adding Water to the Truck: What It Does to Your Slab, and Why I Usually Say No

    Adding Water to the Truck: What It Does to Your Slab, and Why I Usually Say No

    There is a moment on almost every pour where somebody wants water in the truck. Sometimes it is the driver. Sometimes it is a homeowner watching a stiff load come down the chute and deciding it looks wrong. Sometimes it is another sub who wants the concrete to move easier so he can get home.

    I run Skinner Customs out of Rigby and pour across Jefferson, Bonneville and Madison counties. Water in the truck is the single easiest way to turn a good load of concrete into a mediocre slab, and it happens in about ninety seconds with nobody writing anything down. Here is what it actually does, what the standards allow, and where I draw the line.

    Why the load shows up stiff in the first place

    Concrete starts losing slump the moment it is batched. On the way out to a rural job in Jefferson County you can be looking at a long haul from the plant, a wait at the gate, and another wait while the crew finishes screeding the last truck. By the time that drum turns up at the chute, the load is less workable than it was when it left.

    In July it is worse. Heat accelerates everything, and a load that was fine at the plant can arrive tight enough that it does not want to flow around a rebar grid. In November you get the opposite problem, where cold slows the set and the load stays workable longer than anybody expects.

    So a stiff load is not a scandal. It is physics, plus distance. The question is what you do about it.

    What the water actually does

    Concrete strength is governed mostly by the ratio of water to cement in the mix. Add water without adding cement and you have changed the recipe, not just the consistency.

    The National Ready Mixed Concrete Association covers this directly in its bulletin CIP 26, Jobsite Addition of Water, and the sentence worth memorizing is this one:

    Addition of water in excess of the design mixing water will delay setting time, reduce strength, adversely impact durability, and increase the potential for cracking.

    Four separate problems out of one hose. Slower set, lower strength, worse durability, more cracking. The same bulletin plots strength against water added, and the line drops off steeply. There is no version of this where free water is a free improvement.

    The conversion is useful to know because it shows how little it takes:

    A rule of thumb that works reasonably well is 1 gallon, or roughly 10 lb., of water per yd3 for 1 inch increase in slump.

    A ten yard load is ten gallons a yard-inch. Three inches of extra slump on that load is thirty gallons of water nobody designed into the mix. That is not a splash. That is a trash can.

    What the standards do allow

    This is where it gets misrepresented in both directions. Water at the jobsite is not banned. ASTM C94, the ready mixed concrete specification, permits it inside limits, and CIP 26 lays out how:

    Water addition can be in several increments accompanied by mixing to evaluate change in slump.

    And then the conditions, which are the part that gets skipped:

    ASTM C94/C94M requires an additional 30 revolutions of the mixer at mixing speed after the addition of all water or admixtures at the jobsite.

    All water added to concrete on the jobsite must be measured and recorded on the delivery ticket.

    After some concrete is discharged, no water addition is permitted.

    Upon obtaining the desired slump and/or maximum water-cementitious materials ratio, no further addition of water on the jobsite is permitted.

    Read those together and the real rule comes out. Water is allowed before the pour starts, inside the mix design, measured, written on the ticket, and followed by thirty revolutions of mixing. Water is not allowed halfway through a pour because the slab got hard to finish, and it is not allowed past the design water the plant already held back.

    The bulletin also notes the ticket should show how much trim water the plant held back when it batched, which is what sets the ceiling. If you do not know that number, you do not know whether the gallon you just added was inside the design or outside it.

    How it goes wrong on a real job

    What CIP 26 describes is a controlled adjustment made by people who know the numbers. What usually happens on a residential pour is none of those things.

    The load arrives, somebody says it looks dry, water goes in from a hose with nobody counting, the drum spins for maybe ten revolutions, nothing gets written on the ticket, and the pour starts. Nobody ever knows what that slab actually was. If it cracks badly in two winters, there is no record to look at.

    And the worst version is water added to the last two yards, after most of the load is on the ground. Now you have one slab poured at two different water contents, with the wettest, weakest concrete sitting in whatever happens to get poured last. That shows up later as a soft, dusty patch that scales while the rest of the slab holds up.

    What I do instead

    My standard spec does not change because a load came in tight. Four thousand PSI minimum for this climate, air entrained for exterior work, number three or number four rebar on an eighteen-inch grid, four inches of compacted gravel base minimum and more on soft ground.

    What I change is everything upstream of the hose:

    • Order the right slump and tell the plant where the job is. The haul is part of the mix design conversation, not a surprise at the chute.
    • Settle the water question before the first truck. CIP 26 calls for exactly this, a pre-placement conference to determine who is authorized to request a water addition and how it gets documented. On a house slab that is a two-minute conversation in the driveway, but it needs to happen before anyone is standing there with a hose.
    • Use a water reducer, not water, when a load genuinely needs to move. The bulletin is plain that admixtures can raise slump without the strength penalty, and that adding it at the plant gives better control. It also warns that jobsite admixture dosing is not a trivial process, which is true.
    • Have enough hands for the pour. Most of the pressure for water in the truck is really a labor problem. A crew that is behind wants wetter concrete. A crew that is staffed does not.
    • If water goes in, it gets measured and it gets written on the ticket. I keep the tickets. On a foundation or a slab that is going to carry finished flooring, that paper is the only record of what you bought.

    The bid connection

    This is one of the quiet reasons bids come in under the number. Concrete is sold by the yard, and water is free. A load stretched with water is a load that covers more ground, and a crew that can finish sloppy wet concrete fast is a crew that can underbid one that will not.

    I hold an eight dollar per square foot floor on flatwork, and that number assumes the mix that was ordered is the mix that goes down. When a bid comes in well under it, something is paying for the difference. Thinner slab, wire mesh instead of rebar, skipped base prep, or water in the truck. The first three you can at least see on the job. The fourth one leaves no evidence until the surface starts going.

    So when you are comparing bids, ask the question directly. Who is allowed to add water to the truck on this job, and does it get recorded? The answer tells you how the rest of the pour is going to be run.

    Frequently asked questions

    Is it ever okay to add water to a concrete truck?

    Yes, inside limits. ASTM C94 permits a jobsite water addition before discharge when it stays within the design mixing water and the specified maximum slump and water-cement ratio, provided the amount is measured, recorded on the delivery ticket, and followed by thirty revolutions of the drum at mixing speed. What is not acceptable is unmeasured water, or water added after concrete has started coming out.

    How much strength do you lose?

    Enough to matter. NRMCA states that water beyond the design mixing water will delay setting time, reduce strength, hurt durability and increase cracking, and the figure in that bulletin shows strength dropping off steeply as water is added. The rule of thumb is one gallon per cubic yard for each inch of added slump, so the volumes add up faster than people expect.

    My concrete looked too dry coming down the chute. Was something wrong?

    Probably not. Slump loss during a long haul out to a rural job, especially in summer heat, is normal. Stiff concrete is harder to place but it is not weak concrete. Wet concrete is easier to place and it is weaker. Those two facts pull in opposite directions, which is why the decision should not be made by whoever is most tired.

    Can water be added after the pour starts?

    No. Once a significant amount of concrete has been discharged, no further water addition is permitted, because at that point nobody knows the volume being retempered. CIP 26 puts the practical limit at about a quarter cubic yard discharged.

    What is the alternative if a load really will not place?

    A water reducing admixture or superplasticizer, which raises slump without raising the water content. NRMCA notes this is best handled at the plant for better control, which is another reason to talk about the haul and the placement conditions before the trucks are rolling.

    Should hosing the slab during finishing worry me?

    That is a different problem from water in the drum, and it is also bad. Water sprinkled on the surface to make troweling easier raises the water content of the top layer, which is exactly the layer that has to survive traffic, freeze-thaw and de-icer. A dusting, scaling surface a few years in often traces back to that hose.

    Pouring this year?

    If you have a slab, driveway or foundation coming up in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, send me the plan and the site and I will walk you through the mix, the base and the schedule before anything gets ordered.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Air-Entrained Concrete in Eastern Idaho: The Spec That Decides Whether Your Slab Survives Winter

    Air-Entrained Concrete in Eastern Idaho: The Spec That Decides Whether Your Slab Survives Winter

    Every spring I get calls about the same thing. A slab that looked perfect in October is coming apart at the surface in April. Not a crack. The top layer is flaking off in sheets and thin chips, the aggregate is starting to show, and the whole thing feels rough underfoot where it used to be smooth.

    That is scaling, and it is almost always an air problem.

    I run Skinner Customs out of Rigby, and air entrainment is the one spec on a concrete order that nobody asks about and everybody should. It does not show up in a bid. You cannot see it in the finished slab. You find out whether it was right about five months after the truck leaves.

    Here is what it is, what the code actually requires in our part of Idaho, and the three ways it gets lost between the batch plant and the broom.

    What air entrainment actually is

    Air-entrained concrete has microscopic air bubbles mixed into it on purpose. An admixture goes in at the batch plant and creates billions of tiny voids spread evenly through the paste.

    They are there for one reason. Water expands about nine percent when it freezes. Concrete is porous, so it holds water, and when that water freezes inside a slab with nowhere to go, it pushes. Repeat that a few dozen times and the paste at the surface loses its grip on the aggregate.

    The bubbles give that water somewhere to go. They work like expansion tanks inside the concrete. Freeze the slab and the ice pushes into the nearest void instead of into the paste holding everything together.

    This is not the same thing as air that got trapped by sloppy placement. Those are big, irregular voids, and they are a defect. Entrained air is small, deliberate, and measured.

    In Eastern Idaho we do not get one freeze. Rigby, Idaho Falls, Rexburg, Ammon and Shelley all run through dozens of freeze and thaw cycles between November and April, and the worst ones are the spring days that hit the forties in the afternoon and drop into the twenties overnight. That cycle is what takes slabs apart, and it is why this spec matters more here than it does in Boise or Phoenix.

    What the code requires here

    This is not a preference. It is written into the residential code Idaho adopted.

    The 2018 International Residential Code, Section R402.2, Concrete, says: “Concrete subject to moderate or severe weathering as indicated in Table R301.2(1) shall be air entrained as specified in Table R402.2.”

    The map the code points to for that weathering column, Figure R301.2(4), puts our part of Idaho in the severe category. That is the worst of the three.

    Then Table R402.2 sets the number. Footnote d reads: “Concrete shall be air-entrained. Total air content (percent by volume of concrete) shall be not less than 5 percent or more than 7 percent.”

    Five to seven percent. There is a ceiling on it as well as a floor, and that matters, because air costs you strength. Too little and the slab scales. Too much and you have given away compressive strength for protection you did not need.

    The same table sets minimum strength by where the concrete goes. For porches, carport slabs, steps exposed to the weather and garage floor slabs in a severe weathering area, the code floor is 3,500 PSI.

    Why I order 4,000 PSI when code says 3,500

    Because 3,500 is a minimum, and minimums are written for the whole country.

    My standard on flatwork is 4,000 PSI. Our winters are harder on a weak mix than the code floor assumes, and the surface is where you see it first. The difference in concrete cost between those two numbers on a residential driveway is small. The difference five winters later is not.

    There is also a specific case in the code where the two numbers trade against each other. Footnote f allows a garage floor with a steel-troweled finish to drop total air content to as low as 3 percent, but only “if the specified compressive strength of the concrete is increased to not less than 4,000 psi.” That exception exists because hard troweling and high air do not get along, which brings up the next part.

    The three ways air gets lost on a job site

    The batch plant can deliver a perfect 6 percent mix and the slab can still scale. Here is where it goes wrong.

    1. Water added at the truck. Concrete that sits too long gets stiff and hard to place. The fast fix is water in the drum, and it is the most common thing I see on other crews’ pours. It makes the concrete easier to move and it wrecks the mix. More water means lower strength, a weaker paste at the surface, and air content that no longer matches the ticket. If the pour needs to be workable, that gets handled at the plant with the mix design, not with a hose on site.

    2. Over-finishing. Working the surface too much, too hard, or too early drives the entrained air out of the top layer, which is exactly the layer that has to survive winter. A hard steel trowel finish on exterior concrete also seals the surface while bleed water is still trying to get out, and that water comes back as blisters and delamination. The top eighth of an inch lets go in sheets.

    3. Finishing too early. Starting before the bleed water is gone works that water back into the surface. You end up with a thin, weak, water-rich layer sitting on good concrete. It looks fine for one season.

    Two and three are why exterior flatwork gets a broom finish, which is my standard. A broom finish is not a cheaper finish. It leaves the surface texture open, it does not trap bleed water, and it gives you traction on a driveway that is going to be icy four months a year. The slick troweled look belongs on an interior slab that will be covered.

    Deicing salt makes all of this worse

    Salt and ice melt do not attack concrete chemically the way people assume. What they do is pull more water into the surface and increase how many times it cycles through freezing. You are running the same destructive process more often and with more water in it.

    On concrete with the right air content and the right strength, that is survivable. On a low-air, over-finished, water-added slab, deicer is what finishes the job. If a slab is in its first winter, stay off the deicer entirely and use sand for traction.

    What to ask for

    Two things, and both are reasonable to ask of any contractor.

    • The mix spec in writing. PSI and air content, on the bid or the contract. You want to see a number, not the word “standard.”
    • The batch ticket. Every ready-mix load comes with one. It lists the mix design that was delivered. Ask for a copy. A contractor who does not want you to have it is telling you something.

    My floor on flatwork is eight dollars a square foot and it goes up from there with thickness, access and finish. I publish that number because when a bid comes in under it, the money came out of somewhere: a thinner slab, wire mesh instead of rebar, less base prep, or a weaker mix. The mix is the one you cannot see.

    Frequently asked questions

    How do I know if my concrete was air-entrained?
    Ask for the batch ticket from the ready-mix supplier. It lists the mix that was delivered. After the fact, on a finished slab, you cannot tell by looking, and the first real evidence is usually scaling after a winter or two.

    Does air-entrained concrete make a slab weaker?
    Entrained air does trade some compressive strength, which is why the code caps it at 7 percent instead of asking for as much as possible. Specified correctly, the freeze-thaw protection is worth far more than the strength given up. That is also why I order 4,000 PSI rather than the code minimum.

    Is scaling the same thing as cracking?
    No, and they have different causes. Cracking is movement, and joints and rebar control it. Scaling is the surface paste losing its grip and flaking off, and that is a mix and finishing problem. A slab can scale without a single crack in it.

    Can a scaled slab be fixed?
    Sometimes, and it depends on how deep it goes. Surface scaling on otherwise sound concrete can be resurfaced. Once it is deep enough that aggregate is loose and the slab is losing thickness, you are looking at replacement, because the layer that was supposed to protect it is gone.

    Does interior concrete need air entrainment?
    Generally no. An interior slab that will never freeze does not need it, and leaving it out keeps the strength. The code ties the requirement to weather exposure for that reason.

    Why does my neighbor’s driveway look fine and mine is flaking?
    Same winter, different slab. Air content, strength, how hard the surface was finished, whether water went in at the truck, and whether deicer got used in the first season. Any one of those can be the difference.

    Ask about the mix before the truck is ordered

    Reinforcement, thickness and base prep all get discussed because people can picture them. The mix is invisible and it is the one that decides what your slab looks like in five years.

    If you are taking concrete bids in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, ask every bidder for PSI and air content in writing, and ask for the batch ticket when the concrete shows up.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • How Much Slope Does a Concrete Driveway Need in Eastern Idaho?

    How Much Slope Does a Concrete Driveway Need in Eastern Idaho?

    Weight is not what kills concrete driveways in Eastern Idaho. Water is. A 4-inch slab on a compacted base will carry a loaded pickup for forty years. That same slab, poured flat so water sits on it or runs back toward the house, will be spalling at the surface and heaving at the joints in five.

    I run Skinner Customs out of Rigby and I pour driveways from Rexburg down to Shelley. Slope is the cheapest insurance on the whole job. It costs nothing but attention at grade stake time, and it is the single thing I see skipped most often on driveways that come back to bite somebody.

    Here is the number, where it comes from, and what it actually looks like on a real driveway.

    The number: 2 percent, which is a quarter inch per foot

    This is in the code, and it is not vague. The 2018 IRC as adopted in Idaho, section R401.3 Drainage, says:

    “Lots shall be graded to drain surface water away from foundation walls. The grade shall fall not fewer than 6 inches (152 mm) within the first 10 feet (3048 mm).”

    And then, specifically about concrete and asphalt:

    “Impervious surfaces within 10 feet (3048 mm) of the building foundation shall be sloped not less than 2 percent away from the building.”

    Two percent is a quarter inch of drop per foot of run. On a 24-foot driveway from the garage door to the street, that is 6 inches of fall. On a 60-foot approach it is 15 inches. Write those down before you pour anything, because that is the difference between a driveway that drains and one that ponds.

    A quarter inch per foot does not look like anything when you are standing on it. You cannot feel it walking, you will not feel it in a vehicle, and it does not read as a hill in photographs. Homeowners worry about this and they should not. What you will notice is the opposite: a driveway with no fall on it reads instantly after the first rain, because the water is still there an hour later.

    Why it matters more here than in a mild climate

    A flat slab in a dry, warm climate is a cosmetic problem. A flat slab in Jefferson, Bonneville or Madison County is a durability problem, for three reasons.

    Freeze-thaw. Standing water soaks into the top of the slab, freezes overnight, expands and pushes the surface paste apart. Do that across a few dozen cycles every late fall and spring and you get spalling, which is the surface flaking off in sheets and leaving exposed aggregate. Concrete that drains stays dry long enough to survive those cycles.

    Snowmelt instead of rain. Rain is a one-hour event. A snowbank sitting on a driveway panel for a week in February is a continuous water source, melting through the warm part of the day and refreezing every night. Every low spot becomes a reservoir, and the panels around a low spot are the first to go.

    De-icing salt. Water that drains carries the chlorides off the slab. Water that sits concentrates them. If you treat a driveway that holds water, you are soaking the concrete in brine, and new concrete is the most vulnerable to that.

    That is also why I pour 4,000 PSI minimum here and will not go below it. A high-strength, properly air-entrained mix plus real slope is what gets a driveway through twenty Idaho winters. One without the other is a coin flip.

    Where the water is supposed to go

    Slope is a direction, not just a number. Getting the fall right and aiming it somewhere wrong is still a failed driveway.

    • Away from the house, always. That is what R401.3 is about. The garage slab and the apron in front of it have to shed water out and away, never back toward the foundation or into the garage.
    • To the street, a swale or a drain. On most town lots in Rigby and Idaho Falls, the natural answer is the street or the gutter, following the existing grade. On rural lots with no curb, it is usually a swale along one side.
    • Not onto the neighbor and not into the field. Dumping your runoff across a property line creates a problem you will hear about. If the lot does not give you a clean route, that gets designed before the pour, not discovered after.
    • Not into a low spot in the lawn next to the slab. Water that pools against the edge of a driveway soaks the base under the edge, and a saturated base is a settling base.

    R401.3 allows for lots where the grade cannot be made to work: “Where lot lines, walls, slopes or other physical barriers prohibit 6 inches (152 mm) of fall within 10 feet (3048 mm), drains or swales shall be constructed to ensure drainage away from the structure.” That is the honest answer on a tight lot or a benched hillside. It means a drain or a swale, engineered on purpose, not a flat slab and a shrug.

    The garage threshold, where most of the damage happens

    The worst callbacks I see are not out in the middle of the driveway. They are the first four feet in front of the garage door.

    That spot takes everything. Snow falls off the vehicle and off the roofline and piles up right there. The apron is usually the lowest point of the driveway if the slope was set carelessly, because people think about draining the long run and forget the transition at the top. And the door threshold is the one place where standing water has somewhere worse to go, which is under the door and onto the garage slab.

    So the apron gets fall away from the door, the same quarter inch per foot minimum, and the top of the driveway sits below the garage slab, not level with it. On a flat site that sometimes means the whole approach gets set a little lower than the homeowner expected. That is a deliberate choice, and it is the right one.

    What slope cannot fix

    Slope controls where water goes. It does nothing about what is underneath the slab.

    If the base was not compacted, if the fill went in one lift instead of several, if a utility trench crossing the driveway was backfilled loose, the slab settles and your perfect quarter inch per foot becomes a birdbath. I have torn out driveways that were graded correctly on day one and were holding water two years later because the base was never right.

    That is why base prep is the first half of my job and finishing is the last: minimum 4 inches of compacted gravel, placed in lifts on questionable soils, before any steel goes down. And the steel is rebar, number three or number four on an 18-inch grid. Rebar does not stop a crack, but it holds the two sides of one at the same elevation, which keeps a crack from turning into a lip that catches water. Wire mesh does not do that job, because it gets walked flat during the pour and ends up at the bottom of the slab doing nothing.

    What to ask before you sign

    Three questions, and the answers tell you a lot about who you are hiring.

    1. How much fall does my driveway have, and in what direction? You want a number in inches and a direction, not “it will drain.” A contractor who has walked the site can tell you both.
    2. Where does the water end up? Street, swale, drain, or a plan for the tight-lot exception in the code. If nobody can answer this, nobody has thought about it.
    3. How is the apron set relative to the garage slab? You are listening for the driveway sitting below the garage, with fall away from the door.

    Frequently asked questions

    Will I notice a 2 percent slope on my driveway?

    No. A quarter inch per foot is not perceptible underfoot or in a vehicle, and it does not show in photos. What you notice is water that is gone twenty minutes after it stops raining.

    Is more slope better?

    Up to a point. More fall drains faster, and on a long rural approach I will often run more than the minimum because it helps with snowmelt. Past roughly 10 percent you start getting into traction problems on ice and scraping on low vehicles, so it is a balance, not a maximum.

    My driveway is flat and already poured. What are my options?

    Depends on why. If the slab is sound and the problem is one low panel, saw-cutting and replacing that panel can be the fix. If the whole run was poured flat, there is no resurfacing product that creates real drainage over a large area without creating new problems at the edges. Have somebody look at it on site before spending money, because the answer is different for a birdbath than for a flat driveway.

    Does the slope requirement apply to patios and sidewalks too?

    Yes. The code language is about impervious surfaces near the foundation, so a patio against the back of the house falls under the same 2 percent rule. Walks get the same treatment for the same reason.

    What about a driveway that has to run downhill toward the garage?

    That happens on hillside lots and it needs a real drainage design: a trench drain across the apron, tied into something that takes the water away, plus the swale or drain the code exception calls for. It is more expensive than a normal approach and it is not optional on that kind of site.

    Get the grade answer before the forms go in

    If you are collecting driveway bids in Rigby, Idaho Falls, Rexburg, Ammon or Shelley, ask every bidder how much fall your driveway gets and where the water goes. The number is a quarter inch per foot minimum and it is in the code, so anybody who cannot give you an answer is telling you something.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.


    Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.

  • Is Ice Melt Bad for Concrete? How to De-Ice an Eastern Idaho Driveway Without Wrecking It

    Is Ice Melt Bad for Concrete? How to De-Ice an Eastern Idaho Driveway Without Wrecking It

    The first real storm of the year rolls through and every hardware store in Idaho Falls sells out of ice melt by Saturday afternoon. A lot of that ice melt ends up on driveways that are going to look rough by April.

    Not because ice melt is poison. Because of how much goes down, when it goes down, and what kind of concrete it lands on.

    I run Skinner Customs out of Rigby, and the question I get every November is some version of “can I salt my driveway?” The short answer is yes, on the right slab, in the right amount. The long answer is below, because the wrong answer costs you a surface you cannot get back.

    What ice melt actually does to concrete

    Most people picture salt eating the concrete like acid. That is not usually what happens. The damage is mostly physical, and it comes from water.

    Concrete is porous. It soaks up water, and when that water freezes it expands and pushes against the paste around it. The National Ready Mixed Concrete Association lays the mechanism out in its bulletin CIP 2, Scaling Concrete Surfaces:

    “When concrete is saturated with water and temperature approaches freezing, water expands as it forms ice and this causes stresses within concrete. As the number of cycles of freezing and thawing increases, the potential for scaling increases.”

    Then the part that matters for this post:

    “Deicing chemicals exacerbate this by increasing the saturation of concrete at the surface and the number of freezing and thawing cycles.”

    Think about what ice melt does. It turns ice into water on a slab that is sitting right around freezing. That water soaks into the top of the concrete. The sun goes down, it refreezes. The next morning you throw more ice melt on it. Our part of Idaho already gives a slab plenty of freeze-thaw cycles every winter. Heavy de-icing adds more of them, right at the surface, in the wettest part of the slab.

    That is how you get scaling: the top layer flaking off in chips and sheets until the rock starts showing through.

    The first-winter rule

    This is the one I hold every customer to. A slab poured this year does not get any de-icing chemical this winter. Not rock salt, not the blue pellets, not the pet-safe bag. Sand for traction instead.

    NRMCA puts it in plain words in its list of rules to prevent scaling:

    “Avoid the use of deicing chemicals in the first winter and subsequently use them in moderate amounts.”

    The reason is in the same bulletin. Among the most common causes of scaling it lists the “application of excessive amounts of deicing chemicals, especially on newly installed concrete that tends to be saturated and of lower strength.”

    New concrete keeps gaining strength for months after the pour, and it is still holding a lot of its original water. A late-summer or fall slab going into its first Eastern Idaho winter is the most vulnerable it will ever be. One season of sand is cheap insurance on a slab that should last decades.

    If we poured your driveway, patio or walk this year, the rule is sand only through spring.

    After the first winter: moderate, not zero

    Once a slab has a full year behind it and was built right, you can use ice melt. The word NRMCA uses is moderate, and that is the right word.

    Here is what moderate looks like on a driveway:

    1. Shovel first, melt second. Ice melt is for the thin layer you cannot scrape off, not a substitute for the shovel. Every inch of snow you melt instead of moving is water you just put into your slab.
    2. Scatter it, do not pile it. You want granules spread out with bare concrete between them, not a white crust. Read the bag and stay at or below its coverage rate.
    3. Clear the slush. Once it has done its job, push the brine off the slab. Brine left sitting overnight is the refreeze that does the damage.
    4. Keep it off decorative work. Stamped, colored and exposed aggregate surfaces have the most to lose. Sand those.
    5. Watch what drips off the truck. Road brine and salt slush off the wheel wells land in the same spot in your garage and on your apron every night. Rinse those spots on a warm afternoon.
    6. Never use fertilizer as ice melt. Some people grab a bag of fertilizer because it melts ice too. Ammonium-based products are hard on concrete. Use a product sold as ice melt and read the label.

    The bigger factor is how the slab was built

    You can do everything above right and still lose the surface if the concrete was wrong from the start. NRMCA’s list of what causes scaling starts with the mix and the work, not the homeowner:

    • Non-air-entrained concrete, or too little entrained air, especially at the surface
    • Low-strength concrete that lets water in
    • The wrong mix for the job
    • Too much de-icer, especially on new concrete
    • Improper finishing
    • Insufficient curing

    Only one of those six is on you. The rest were decided before the slab ever saw snow.

    For concrete that will see freezing and de-icers, the bulletin calls for exterior slabs ordered at “specified strength of 4000 psi” and air-entrained concrete with a total air content of 6 percent for the common coarse aggregate sizes. That lines up with how I pour. Every exterior slab I place is 4,000 PSI minimum because of our freeze-thaw cycles, on a compacted gravel base, reinforced with rebar, broom finished, and properly cured.

    If you are getting bids for a driveway next year, ask every contractor what strength and air content they are ordering. If they cannot answer, that tells you something.

    What scaling looks like, and when to call

    NRMCA describes three levels. Light scaling does not expose the coarse aggregate. Moderate scaling exposes the aggregate and may involve “loss of up to ⅛ to ⅜ inch” of the surface mortar. Severe scaling leaves the aggregate clearly exposed and standing out.

    Light scaling is mostly cosmetic. If it is spreading year over year, or the rock is standing proud of the surface, the bulletin notes that light to moderate scaling can be repaired with a thin bonded resurfacing once the unsound surface is removed, and that repairing slabs with excessive and progressing scaling “may not be feasible.” Repair material also will not match the color of the original concrete.

    The cheapest fix is the one you never need. Shovel more, melt less, and keep chemicals off a new slab.

    Frequently Asked Questions

    Is ice melt bad for concrete?

    Used heavily, especially on new concrete, yes. It does not usually eat the concrete. It makes the surface wetter and adds freeze-thaw cycles, which is what causes scaling. Used in moderate amounts on a well-built slab that has been through its first winter, it is fine.

    Can I use rock salt on a driveway poured this year?

    No. Skip all de-icing chemicals the first winter and use sand for traction. NRMCA recommends avoiding deicers in the first winter because new concrete is still saturated and has not reached full strength.

    Is pet-safe ice melt safe for new concrete?

    It is safer for paws, not for a new slab. It still turns ice into water on the surface, and that water is what does the damage. Sand the first winter.

    Should I seal my driveway before winter?

    A breathable sealer is on NRMCA’s list of ways to help prevent scaling. Penetrating sealers need warm, dry conditions to cure, and here that window usually closes in October. If you missed it, plan to seal in the spring and go light on de-icers until then.

    What is the safest way to deal with ice on concrete?

    Shovel early and often, use sand for traction, and use ice melt only for the thin layer you cannot scrape off. Push the slush off once it melts so it cannot refreeze on the slab overnight.

    My driveway is already flaking. Can it be fixed?

    Light to moderate scaling can often be repaired with a thin bonded resurfacing once the loose surface is removed. Severe or spreading scaling may mean the slab or some panels need replacing. Send me photos and I will tell you which one you are looking at.

    Worried about your slab this winter?

    If you have a driveway, patio or walk in Rigby, Idaho Falls, Rexburg, Ammon or Shelley that is starting to flake, or you are planning a pour for next season, call me and I will tell you straight what you are looking at.

    Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.