An ADA ramp concrete pour is the one job where the design is mostly decided before anybody looks at the site. The rise sets it. Measure from the finished grade where the ramp starts up to the landing or threshold at the top, and that number tells you how long the ramp has to be, how many landings it needs, and whether it fits where you want to put it.
I run Skinner Customs out of Rigby and I pour ramps on both sides of the line: commercial entries that have to meet the standard on paper, and homes where somebody needs to get a wheelchair or a walker to the front door without a fight. The code math is the same. What changes is who is checking it.
The rise decides the ramp, not the space you have
The federal standard caps ramp slope at 1:12. One inch of rise needs twelve inches of run. That single ratio is where most ramp plans fall apart.
Work a real example. Your front door landing sits 24 inches above the sidewalk. At 1:12 that is 24 feet of sloped concrete, minimum, and that is before the landings. You need a level landing at the bottom and another at the top, each at least 60 inches long, so you are looking at roughly 34 feet of straight-line footprint for a two-foot rise.
Most front yards in Rigby and Idaho Falls do not have 34 feet of straight run between the door and the drive. That is why ramps turn. Every change of direction needs a level landing at least 60 inches by 60 inches, and a switchback eats more square footage than people expect.
The standard also caps a single run at 30 inches of rise. Go higher than that and the ramp breaks into two runs with a landing between them, whether you want the landing there or not.
Where the ADA applies, and where it does not
Worth being straight about this, because it changes what you are obligated to build.
The Americans with Disabilities Act covers places of public accommodation and commercial facilities. A church, a clinic, a storefront, an office, a restaurant. If your building is open to the public, the standard is not advice, it is the requirement, and an inspector or an attorney can hold you to it.
A private single-family home is not covered by the ADA. Nobody is going to cite you for a 1:10 ramp at your own front door.
That said, I build residential ramps to the same standard anyway, and I would push you to do the same. A ramp steeper than 1:12 is one a person in a manual chair cannot get up without help, and it is the one that gets away from them coming down. Pouring it a little longer is cheaper than pouring it twice.
The numbers the standard sets
These are the figures I design to, straight out of the U.S. Access Board guidance on ramps:
| Item | Requirement |
|---|---|
| Running slope | 1:12 maximum (section 405.2) |
| Cross slope | 1:48 maximum (405.3) |
| Clear width | 36 inches minimum, measured between handrails where they exist (405.5) |
| Maximum rise per run | 30 inches (405.6) |
| Landings | Level, at least as wide as the run and 60 inches long; 60 by 60 inches where the ramp changes direction (405.7) |
| Handrails | Required on both sides when the rise is greater than 6 inches (405.8) |
| Edge protection | Curbs at least 4 inches high, a barrier, or the surface extended at least 12 inches past the inside face of the handrail (405.9) |
| Surface | Firm, stable and slip resistant |
Two more worth knowing. A walking surface sloped 1:20 or flatter is not a ramp at all under the standard, it is a walk, and it needs no handrails or edge protection. Sometimes the smartest move on a shallow rise is to regrade and pour a long gentle walk instead of a ramp. And on an alteration to an existing building where the space genuinely is not there, the standard allows up to 1:10 for a rise of 6 inches or less, or 1:8 for 3 inches or less. Those are exceptions for existing buildings, not a starting point for new work.
A ramp is not flatwork, and the dirt is why
A patio sits on the ground and stays there. A ramp is a sloped structure with footings under it, and it has to hold its shape for thirty years while the ground underneath freezes and thaws.
What goes into my ramps:
- Footings below frost depth. Around here that means 36 inches and up. Confirm the number with the building department in Jefferson, Bonneville or Madison County, because the approved plan carries it and the inspector reads the plan.
- Compacted gravel base, 4 inches minimum, placed in lifts and compacted each lift. More on fill or questionable soil. A ramp has the most to lose from a soft spot, because a half inch of settlement on a sloped slab shows up as a crack and a trip hazard.
- Rebar only. Number 3 or number 4 on an 18-inch grid. Wire mesh lifts out of position during the pour and leaves you cracking at the joints, and on a ramp with a curb and a landing that is exactly where you do not want it.
- 4,000 PSI minimum for this climate and its freeze-thaw cycles.
- Broom finish across the slope. Traction matters more here than anywhere else on the property. Smooth troweled concrete on a 1:12 slope in February is a liability.
- Drainage designed in. Water has to run off the landing, not sit on it.
What Eastern Idaho winters do to a sloped slab
A ramp is the first thing to ice over and the last thing to dry out. It catches the water coming off the roof and the walk above it, and the bottom landing is usually the low spot in the whole approach.
So base prep and drainage are not upsells on a ramp, they are the job. I would rather spend the money under the concrete than come back in three years to a heaved landing.
One more thing, same as every new pour: keep de-icing salt off it the first winter. New concrete has not finished gaining strength, and chloride on a green slab scales the surface. Use sand for traction that first season.
What actually drives the price
Nobody quotes a ramp off a photo. These are the things that move the number, roughly in the order they move it:
- Total rise. This is the big one. Rise sets length, length sets square footage, and a two-foot rise is double the concrete of a one-foot rise before you add anything else.
- Landings and turns. Each landing is flat square footage that carries no slope, and a switchback adds forming and edge work on top of it.
- Wall height alongside the ramp. A ramp cut into a slope needs curbs or short stem walls on the sides. The taller those get, the more forming, rebar and concrete go in.
- Demolition. Taking out existing steps, a walk or an old apron first is its own line item, hauling included.
- Site access. Whether the truck can get a chute to the forms, or the pour has to be wheeled or pumped.
- Soil and fill. How deep good ground is, and whether a soils report is in play.
- Handrails. Required over a 6-inch rise, and usually a separate trade from the concrete. Ask whoever is bidding your ramp whether rail is in or out of the number. That is the most common surprise on a ramp bid.
- Finish. Broom is included. Color, stamped borders or exposed aggregate are extra.
- Permit and engineering. A commercial ramp often needs stamped drawings and an inspection. A residential ramp usually does not. Your building department has the final say.
Why there is no per-ramp price on this page
Because a ramp price written without a rise is a guess that reads like a quote.
I have put real numbers on this blog for driveways, patios, flatwork, slabs and foundations, because those price by the square foot and the square footage is knowable from a tape measure. A ramp does not work that way. Two ramps with identical square footage can land well apart on cost depending on wall height, landings, and what has to come out first.
Measure from the ground where the ramp will start to the top of the landing or the door threshold, tell me how much straight run you have to work with, and send a photo of the approach. That is enough for me to tell you what fits, what the standard requires there, and what the concrete costs.
Frequently asked questions
What is the maximum slope for an ADA ramp?
1:12, or one inch of rise for every twelve inches of run. Alterations to existing buildings may go to 1:10 for a 6-inch rise, or 1:8 for a 3-inch rise, where space genuinely does not allow 1:12.
How long does a ramp need to be for a 24-inch rise?
24 feet of sloped run at 1:12, plus a level landing at the top and the bottom. Figure roughly 34 feet of total footprint in a straight line, less if it switches back.
How wide does a concrete ADA ramp have to be?
36 inches of clear width minimum, measured between the handrails where handrails are installed.
Do I need handrails on a residential ramp?
The standard requires them on both sides once the rise is over 6 inches. A private home is not covered by the ADA, so it is not enforced on you there, but a ramp with any real rise and no rail is not one I would want somebody using in January.
Does an ADA ramp need a permit in Eastern Idaho?
Commercial work usually does, and often wants engineered drawings with it. Residential varies by jurisdiction. Call the building department for your county or city before anybody forms anything.
Can you pour a ramp in the winter?
Yes, with cold-weather measures, but a ramp is a job I would rather schedule in better weather when the timeline allows. The finish on a sloped slab matters more, and cold makes it harder.
Get a number for your rise
Measure the rise, take a picture of the approach, and send both over. I will tell you what the standard requires at that height, whether a gentle walk makes more sense than a ramp, and what the concrete runs.
Need concrete work in Eastern Idaho? Call Zach at Skinner Customs at (208) 390-5794 or start at skinner-customs.com.
Content produced in partnership with S4 Media, marketing partner of SwagerBuilds LLC.